Preparing the subcontract control price and the subcontract target price: concept distinction, preparation bases, inversion check, and linking the two prices

The subcontract control price is the enterprise's internal maximum bid limit for subcontract tendering (referring to GB/T 50500-2024 Clause 5.2.1, prepared by the market or cost method, and must pass the inversion check of not exceeding the corresponding main contract revenue item); the subcontract target price is the internal expected cost (integrated into the target cost system per GB/T 50326-2017 Clause 11.2.4: bid-cost separation + estimation on the basis of the contractor's in-house norms, decomposed by contract section/responsible department, effective upon approval by the authorized person). Relationship of the two: control price <= corresponding main contract revenue item, target price <= control price; the transaction price falling between the two is optimal, with dynamic correction by three-cost comparison.

Applicable Codes

  • GB/T 50500-2024 建设工程工程量清单计价标准
  • GB/T 50326-2017 建设工程项目管理规范
  • T/ZBD 100.1-2022 建设工程造价数据建设通用标准
  • DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范
  • GB/T 51235-2017 建筑信息模型施工应用标准

Topic Positioning

The methodology for general contracting / EPC enterprises to prepare the subcontract control price (maximum bid limit for subcontract tendering) and the subcontract target price (internal expected cost): the concept distinction between the two prices, preparation bases and steps, the inversion check, and the linking and dynamic management of the two.

Core Conclusions

  • Different positioning of the two prices: the control price externally constrains the bidding ceiling, preventing ring-bidding price pushing; the target price is the enterprise's internal cost target, assessing procurement performance. Relationship: control price <= corresponding main contract revenue item, target price <= control price.
  • Control price preparation referring to GB/T 50500-2024 Clause 5.2.1: take the corresponding items of the main contractor's priced BOQ as the revenue benchmark, combined with the subcontract BOQ (five elements aligned), pricing bases and enterprise supplementary quotas, and market inquiries; the method may be the market method (referring to unit prices of similar BOQ items) or the cost method (subcontract cost + reasonable profit); after preparation, an inversion check is mandatory — the control price must not exceed the corresponding main contract revenue item net of management and coordination costs; if exceeded, fall back to adjust the scope or hedge with unbalanced bidding — inverted release is not allowed. One subcontract contract gets one control price.
  • The target price integrates into the target cost system (GB/T 50326-2017 Clause 11.2.4, six steps): bid-cost separation to obtain the cost benchmark → resource consumption per the contractor's in-house norms x market factor prices to estimate the subcontract cost → allocate the target price → cut and decompose by contract section and responsible department (DBJ/T 15-153-2019, Clause 5.7.3) → effective upon approval by the enterprise's authorized person.
  • Preparation order: first estimate the target price (bottom line), then set the control price (ceiling); the transaction price falling between the two is optimal; use three-cost comparison (budget/target/actual cost) for dynamic correction.

Applicable Boundaries

Applies to price management by general contracting enterprises over specialist and labor subcontracts; the control price rules refer to the national maximum bid limit rules but are set autonomously by the enterprise. Not applicable to specialist works directly awarded by the employer (prices managed by the employer); state-funded projects tendered externally must still follow the statutory maximum bid limit rules. The target price follows the enterprise's own quota level and must not directly apply government quota prices.

Further Reading

GB/T 50500-2024 Clause 5.2.1 (preparation bases), Clause 5.1.1 (publication requirements); T/ZBD 100.1-2022 Clause 6.4.3 (market method and cost method); GB/T 50326-2017 Clause 11.2.4 (cost plan procedure), Clause 11.1.3 (cost management procedure), Clause 11.3.2 (cost control procedure); DBJ/T 15-153-2019 Clause 5.7.3 (target cost decomposed by contract section/responsible department); GB/T 51235-2017 Clause 9.3.1 (three-cost comparison).