Scope of GB/T 50500-2024: state-funded works shall use BOQ pricing (compulsion now carried by MOHURD Order No. 16), others should/may choose freely, compared with GB 50500-2013
Per GB/T 50500-2024 Clause 3.1.1: works invested with fiscal or state-owned funds "shall" prepare BOQs per national and industry measurement standards and use BOQ pricing; non-state-funded works "should", and may choose other methods (3.1.5 allows percentage-fee and other pricing where unit-price/lump-sum pricing is unsuitable, provided the pricing requirements and adjustment rules are stated in tender and contract documents). The 2024 edition changed from a mandatory GB (50500-2013) to recommended GB/T - "must" became "shall", mandatory provisions repealed - but the practical rule "state-funded works must use BOQ pricing" is not relaxed: compulsion is carried by Article 6 of the "Measures for pricing of construction contracting" (MOHURD Order No. 16): such works "shall adopt BOQ pricing".
Applicable Codes
- GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.1.1条、第3.1.5条
- GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第3.1.1~3.1.3条(已废止)
- 《建筑工程施工发包与承包计价管理办法》(住房和城乡建设部令第16号)第六条
- https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2024/art_6186304e164c4c4982904f8734983235.html
- https://czj.wenzhou.gov.cn/art/2023/5/13/art_1229729262_58829924.html
Topic Positioning
The scope of GB/T 50500-2024: must state-funded projects use BOQ pricing, can private projects choose freely, and how the wording and source of compulsion changed versus the repealed GB 50500-2013 - for quick compliance judgment in cost engineering, tendering, and contract management.
Core Conclusions
I. Scope clause (GB/T 50500-2024 Clause 3.1.1, effective 1 Sep 2025): "Measurement and pricing in construction tendering and contracting shall comply with: 1 Works invested with fiscal or state-owned funds shall prepare BOQs per national and industry measurement standards and use BOQ pricing; 2 Works not invested with fiscal or state funds should prepare BOQs per national and industry measurement standards and use BOQ pricing."
II. Definition of "fiscal or state-owned funds" (same clause): all state-owned funds, predominantly state-funded, or state financing, including: (1) State investment: projects using fiscal budget funds at any level; government special construction funds under fiscal management; self-owned funds of state-owned enterprises/institutions with actual state control. (2) State financing: national bond proceeds; state foreign borrowing or guarantees; policy loans; financing by state-authorized investment entities; state-franchised financing. (3) Predominantly state-owned: state funds 50%+ of total investment, or under 50% but with state investors substantively controlling.
III. Flexibility clause (3.1.5, new in 2024): "Prices of BOQ items may be determined by unit-price or lump-sum pricing. Where unit-price/lump-sum pricing is unsuitable given the project's characteristics, percentage-fee or other pricing may be used, with pricing requirements and adjustment rules stated in the tender and contract documents."
IV. Contrast with GB 50500-2013 (repealed):
- 3.1.1 Works contracted with state-owned funds must use BOQ pricing. (bold mandatory)
- 3.1.2 Non-state-funded works should use BOQ pricing.
- 3.1.3 Works not using BOQ pricing shall execute the other provisions of this code except BOQ-specific ones.
- 2024 renumbers GB 50500-2013 to GB/T 50500-2024 (recommended); the mandatory bold provisions expired with the old edition; "must" became "shall".
V. Source of compulsion shifted (practical rule not relaxed): "Measures for pricing of construction contracting" (MOHURD Order No. 16, effective 1 Feb 2014), Article 6: "Construction works wholly funded with state-owned funds or predominantly so (state-funded works) shall adopt BOQ pricing; non-state-funded works are encouraged to adopt BOQ pricing." Also, state-controlled projects are mandatory-tender projects whose tender documents follow the national/industry model texts, with the BOQ forming part of the documents.
Applicable Boundaries
- Targets measurement and pricing in construction tendering and contracting (3.1.1 scope).
- "Shall/should" are standard words inside a recommended standard: GB/T carries no mandatory provisions; the "must use BOQ" constraint for state-funded works is carried by departmental rules (Order No. 16 Article 6 "shall") and the tendering system - one cannot argue that state-funded works may skip BOQ merely because GB/T is recommended.
- Private projects choosing percentage-fee or other methods must state pricing requirements and adjustment rules in tender and contract documents - no implicit adoption.
- Works not using BOQ pricing still execute the standard's other provisions (in the spirit of 2013 3.1.3).
Further Reading
- GB/T 50500-2024 Clauses 3.1.1 and 3.1.5; repealed GB 50500-2013 3.1.1-3.1.3 (consistently republished across sources).
- MOHURD approval announcement: https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2024/art_6186304e164c4c4982904f8734983235.html
- MOHURD Order No. 16 full text (Wenzhou Finance Bureau repost; Article 6): https://czj.wenzhou.gov.cn/art/2023/5/13/art_1229729262_58829924.html
- Companion cards: the three pricing modes defined; tender-BOQ liability 2013 vs 2024; measurability dichotomy vs three-way pricing classification for preliminaries.
Keywords
- pricing on a bill of quantities basis
- GB/T 50500-2024
- 国有资金
- 适用范围
- GB 50500-2013
- mandatory provisions of codes
- MOHURD Decree No. 16
- 非国有资金