Applying TB/T 10823-2024 for double-wall steel cofferdam wall infill and bottom-seal concrete (QY-64) and the quantity boundary against pile-cap concrete

Double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete uses item QY-64 (unit 10 m3, work content: concreting), belonging to cofferdam and island-building auxiliary works; the volume notes state the double-wall cofferdam sinking quota excludes wall-infill concrete, which must be booked separately. Wall infill (cofferdam cavity), bottom seal (below the cap underside), and the pile cap (above the seal top) occupy non-overlapping spaces; the cap volume is measured from the seal top — no double counting.

Applicable Codes

  • TB/T 10823-2024 · Budget Quota of Railway Engineering (Volume 2: Bridge and Culvert Works)

Topic Positioning

Pricing by applying quota line items (item QY-64) for double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete in the railway 2024 quota system (TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works"), and the quantity boundary against pile-cap concrete — for correct item selection and double-counting prevention in bridge substructure estimates and budgets.

Core Conclusions

  1. Wall infill and bottom-seal concrete use QY-64 "double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete", unit 10 m3, work content: concreting; the item sits in Chapter 1 substructure works, Section 2 cofferdams and island building (3. Steel cofferdams).
  2. Volume note 6: "The double-wall steel cofferdam sinking quota does not include wall-infill concrete; when needed, book separately by the infill concrete quota" — wall infill is booked apart from the sinking quota, not included in the sinking items, so there is no "included elsewhere, then applied again" double counting.
  3. No double counting with pile-cap concrete: three concrete bodies stack physically without overlap — wall infill sits in the cavity between the cofferdam's double walls (part of the cofferdam itself); the bottom seal sits at the cofferdam bottom below the cap's design underside (sealing and waterproofing); the cap is the designed cap solid above the seal top. The budget boundary: the cap volume is measured upward from the seal's top level; concrete within the seal thickness counts only under QY-64, never as cap quantity; wall infill is the net cavity volume between the walls, not overlapping the cap inside the cofferdam core.
  4. Volume note 8: for large steel cofferdams sinking in overburden, base cleaning, wall infill, and bottom-seal concrete, use the general double-wall cofferdam sinking-in-overburden quota.
  5. Steel cofferdam quantity rules (volume note 11): floating quantity per the design floating weight; assembly quantity per the design cofferdam-body weight, excluding the platform weight; sinking in water per the section enclosed by the cofferdam's outer edge multiplied by the height from the design construction water level to the original riverbed center.

Applicable Boundaries

  • Applies only to substructure works of TB/T 10823-2024 Volume 2 (bridge and culvert works); not to highway, municipal, or building quota systems.
  • Classification: general steel cofferdam = section enclosed by the outer edge <=1000 m2; large steel cofferdam <=3000 m2.
  • The sinking-in-water quota for double-wall cofferdams already amortizes the positioning boat (or piles) and the upper/lower bow cables to the cofferdam — bow cables are not booked again; the sinking quota excludes wall-infill concrete (QY-64 separately).
  • The double-wall and large cofferdam assembly items exclude the cofferdam amortized quantity, which the design scheme determines; the large-cofferdam bottom-section assembly item excludes assembly-yard treatment, booked separately when needed.
  • Pile-cap concrete is booked under the main-works (bridge foundation) items — an auxiliary-works line versus a main-works line, not double-applied; process differences between dry pouring after sealing and underwater pouring follow the cap chapter's own items.

Further Reading

  • TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works", Chapter 1 substructure, Section 2 cofferdams and island building — volume notes 2-11 (steel sheet piling priced per driving/extraction and per quarter of use, part quarters as whole; cofferdam classification; sinking-quota contents; the table of barge (<=400 t) shift increments/decrements when the positioning boat changes; quantity rules) and 3. Steel cofferdams, (7) double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete QY-64.
  • Related quota contents: the sheet-pile items exclude internal bracing fabrication/erection/removal — by reference, per 10 m2 of single-layer enclosed section, bracing steel 870 kg (channel 464 kg, pipe 246 kg, plate 160 kg).
  • Earth-dam and woven-bag cofferdams and island filling are priced from borrow in place; cofferdam quantities: length per the cofferdam centerline, height per design construction water level + 0.5 m, excluding island fill, which is booked separately by the island-filling items.