Applying TB/T 10823-2024 for double-wall steel cofferdam wall infill and bottom-seal concrete (QY-64) and the quantity boundary against pile-cap concrete
Double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete uses item QY-64 (unit 10 m3, work content: concreting), belonging to cofferdam and island-building auxiliary works; the volume notes state the double-wall cofferdam sinking quota excludes wall-infill concrete, which must be booked separately. Wall infill (cofferdam cavity), bottom seal (below the cap underside), and the pile cap (above the seal top) occupy non-overlapping spaces; the cap volume is measured from the seal top — no double counting.
Applicable Codes
- TB/T 10823-2024 · Budget Quota of Railway Engineering (Volume 2: Bridge and Culvert Works)
Topic Positioning
Pricing by applying quota line items (item QY-64) for double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete in the railway 2024 quota system (TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works"), and the quantity boundary against pile-cap concrete — for correct item selection and double-counting prevention in bridge substructure estimates and budgets.
Core Conclusions
- Wall infill and bottom-seal concrete use QY-64 "double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete", unit 10 m3, work content: concreting; the item sits in Chapter 1 substructure works, Section 2 cofferdams and island building (3. Steel cofferdams).
- Volume note 6: "The double-wall steel cofferdam sinking quota does not include wall-infill concrete; when needed, book separately by the infill concrete quota" — wall infill is booked apart from the sinking quota, not included in the sinking items, so there is no "included elsewhere, then applied again" double counting.
- No double counting with pile-cap concrete: three concrete bodies stack physically without overlap — wall infill sits in the cavity between the cofferdam's double walls (part of the cofferdam itself); the bottom seal sits at the cofferdam bottom below the cap's design underside (sealing and waterproofing); the cap is the designed cap solid above the seal top. The budget boundary: the cap volume is measured upward from the seal's top level; concrete within the seal thickness counts only under QY-64, never as cap quantity; wall infill is the net cavity volume between the walls, not overlapping the cap inside the cofferdam core.
- Volume note 8: for large steel cofferdams sinking in overburden, base cleaning, wall infill, and bottom-seal concrete, use the general double-wall cofferdam sinking-in-overburden quota.
- Steel cofferdam quantity rules (volume note 11): floating quantity per the design floating weight; assembly quantity per the design cofferdam-body weight, excluding the platform weight; sinking in water per the section enclosed by the cofferdam's outer edge multiplied by the height from the design construction water level to the original riverbed center.
Applicable Boundaries
- Applies only to substructure works of TB/T 10823-2024 Volume 2 (bridge and culvert works); not to highway, municipal, or building quota systems.
- Classification: general steel cofferdam = section enclosed by the outer edge <=1000 m2; large steel cofferdam <=3000 m2.
- The sinking-in-water quota for double-wall cofferdams already amortizes the positioning boat (or piles) and the upper/lower bow cables to the cofferdam — bow cables are not booked again; the sinking quota excludes wall-infill concrete (QY-64 separately).
- The double-wall and large cofferdam assembly items exclude the cofferdam amortized quantity, which the design scheme determines; the large-cofferdam bottom-section assembly item excludes assembly-yard treatment, booked separately when needed.
- Pile-cap concrete is booked under the main-works (bridge foundation) items — an auxiliary-works line versus a main-works line, not double-applied; process differences between dry pouring after sealing and underwater pouring follow the cap chapter's own items.
Further Reading
- TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works", Chapter 1 substructure, Section 2 cofferdams and island building — volume notes 2-11 (steel sheet piling priced per driving/extraction and per quarter of use, part quarters as whole; cofferdam classification; sinking-quota contents; the table of barge (<=400 t) shift increments/decrements when the positioning boat changes; quantity rules) and 3. Steel cofferdams, (7) double-wall steel cofferdam (floating steel caisson) wall infill and bottom-seal concrete QY-64.
- Related quota contents: the sheet-pile items exclude internal bracing fabrication/erection/removal — by reference, per 10 m2 of single-layer enclosed section, bracing steel 870 kg (channel 464 kg, pipe 246 kg, plate 160 kg).
- Earth-dam and woven-bag cofferdams and island filling are priced from borrow in place; cofferdam quantities: length per the cofferdam centerline, height per design construction water level + 0.5 m, excluding island fill, which is booked separately by the island-filling items.
Keywords
- 双壁钢围堰
- 壁内填充
- 封底混凝土
- QY-64
- 围堰及筑岛
- TB/T 10823-2024
- railway works budget quota manual (China Railway)
- 钢围堰
- 承台混凝土
- 浮运钢沉井