The determination chain for when building MEP piping must have seismic supports and hangers: the overall determination by fortification intensity (GB 50981-2014 clause 1.0.4 / GB 55002-2021 clause 1.0.2), the per-system component threshold clauses (3.1.6, 4.1.2, 5.1.3, 5.1.4, 6.1.1, 7.1.2), the combined-use and substitution boundaries with load-bearing and anti-sway supports, and the exemption situations
Determination is two-step: (1) overall threshold - GB 50981-2014 clause 1.0.4 (a mandatory provision, superseded by GB 55002-2021 from 1 January 2022): 'building MEP works in areas of seismic fortification intensity 6 and above must be seismically designed'; the current basis is GB 55002-2021 clauses 1.0.2 and 5.1.12; (2) component thresholds - clause 3.1.6 sets an overall gate at 'equipment gravity over 1.8 kN / hanger rod calculated length over 300 mm', with per-system thresholds: horizontal pipes of water, hot water and fire protection piping DN65 and above (clause 4.1.2 item 3, 'shall'), gas piping of internal diameter no less than 25 mm (6.1.1, 'shall'), ducts with rectangular section no less than 0.38 m2 and circular diameter no less than 0.70 m (5.1.3 item 3, original wording 'may'), smoke control and exhaust and emergency ventilation ducts and related equipment (5.1.4, 'shall'), electrical conduits of internal diameter no less than 60 mm and cable trays, troughs and busways of gravity no less than 150 N/m (7.1.2, 'shall'). Seismic supports and hangers take seismic force as their principal load (2.1.6) and must resist seismic action from any horizontal direction (8.1.1); ordinary load-bearing supports are no substitute; where they coincide with anti-sway supports, seismic bracing alone may be provided (4.1.2 item 3), and where they coincide with gravity supports, if the seismic support can carry the gravity the seismic support alone may be used, subject to seismic verification and gravity calculation sheets (DBJ 46-059-2021 clause 8.1.5).
Applicable Codes
- GB 50981-2014 · Code for Seismic Design of Building Mechanical and Electrical Engineering 第1.0.2、1.0.4、2.1.6、3.1.6、4.1.2、5.1.3、5.1.4、6.1.1、7.1.2、8.1.1、8.2.3、8.3.1、8.3.3、8.3.6、8.3.14、8.3.15条
- GB 55002-2021 · General Code for Seismic Resistance of Building and Municipal Engineering 第1.0.2、5.1.12条
- GB 50011-2010 · Code for Seismic Design of Buildings 第1.0.2、3.7.1条
- GB 18306-2015《中国地震动参数区划图》
- DBJ 46-059-2021 建筑机电工程抗震技术标准 第8.1.5条
- DB11/T 1810-2020 装配式抗震支吊架施工质量验收规范 第5.3.2条
- 《建设工程质量管理条例》(国务院令第279号)第三条、第十五条、第六十九条
Topic positioning
This card gives the complete determination chain for 'under what conditions building MEP piping and equipment must have seismic supports and hangers': an overall determination by seismic fortification intensity first, then item-by-item determination by system and component size thresholds (clause numbers noted item by item), a clarification of the combined-use and substitution boundaries between seismic supports and ordinary load-bearing supports and hangers and anti-sway supports, and the exemption situations. It applies to seismic fortification determination and the subsequent layout calculation of piping and equipment supports in building water supply and drainage and fire protection, HVAC and smoke control, electrical, gas and other disciplines.
Core conclusions
1. Overall determination: the fortification intensity gate
- GB 50981-2014 clause 1.0.4 (mandatory provision): 'Building MEP works in areas of seismic fortification intensity 6 and above must be seismically designed.'
- Scope (clause 1.0.2): 'This code applies to seismic design of building MEP works at seismic fortification intensities 6 to 9; it does not apply to seismic design of building MEP works at intensities above 9 or with special requirements.'
- Content of seismic design (commentary on clause 1.0.4): it covers seismic action calculation and seismic verification of the section capacity of supports, connectors or anchors for building MEP equipment, and the seismic measures taken under this code, but excludes seismic design of the equipment itself.
- Currency: GB 50981-2014 clauses 1.0.4 and 5.1.4 were superseded by the General Code for Seismic Design of Buildings and Municipal Engineering GB 55002-2021 from 1 January 2022. The current overriding mandatory basis is GB 55002-2021 clause 1.0.2: 'All new, extended and reconstructed buildings and municipal works in areas of seismic fortification intensity 6 and above must be seismically fortified, and the survey, design, construction, use and maintenance of the project must comply with this code.' The MEP counterpart is clause 5.1.12: 'Non-structural components of buildings and attached MEP equipment, themselves and their connections to the main structure, shall be seismically fortified.' (The commentary lists the attached MEP equipment as mainly lifts, lighting and emergency power, broadcasting and television equipment, communication equipment, piping systems, heating and air conditioning systems, and fire detection and fire protection systems; for equipment and piping, seismic design refers mainly to anchorage and connection.)
2. Component determination thresholds (clause by clause)
Overall gate (GB 50981-2014 clause 3.1.6): 'Seismic design of building MEP installations shall take the building structural design as its basis, and measures shall be taken to fortify the connectors to the building structure. Equipment with gravity not more than 1.8 kN, and piping suspended on hanger rods whose calculated length is not more than 300 mm, may be left unfortified.' The commentary lists 'equipment over 1.8 kN requiring seismic fortification' as mainly: (1) equipment within suspended piping with gravity over 1.8 kN; (2) domestic water and fire protection piping systems above DN65; (3) duct systems with rectangular section area no less than 0.38 m2 and circular diameter no less than 0.7 m; (4) electrical conduit of internal diameter no less than 60 mm and cable trays, cable troughs and busways with gravity no less than 150 N/m.
| System / component | Threshold (original wording) | Clause basis | Strength word |
|---|---|---|---|
| Indoor water supply, hot water and fire protection piping | 'Horizontal pipes of indoor water supply, hot water and fire protection piping requiring fortification, of diameter DN65 or larger, where fixed by hangers, brackets or supports, shall be provided with seismic bracing as required by chapter 8 of this code' | 4.1.2 item 3 | shall |
| Gas piping | 'Gas piping of internal diameter no less than 25 mm shall be seismically designed, and the seismic supports and hangers of the piping shall comply with chapter 8 of this code' | 6.1.1 | shall |
| Ventilation and air conditioning ducts | 'Ducts with rectangular section area no less than 0.38 m2 and circular diameter no less than 0.70 m may use seismic supports and hangers, whose placement and design shall comply with chapter 8 of this code' | 5.1.3 item 3 | may (see applicability boundaries) |
| Smoke control and exhaust ducts, emergency ventilation ducts and related equipment | 'Smoke control and exhaust ducts, emergency ventilation ducts and related equipment shall use seismic supports and hangers' (the clause states the reason: earthquakes are very likely to be accompanied by fire, and emergency ventilation systems must quickly resume operation to exhaust harmful gases before the main structure collapses) | 5.1.4 (formerly mandatory) | shall |
| Electrical conduit | 'Electrical conduit of internal diameter no less than 60 mm ... shall all be seismically fortified' | 7.1.2 | shall |
| Cable trays, cable troughs, busways | 'Cable trays, cable troughs and busways with gravity no less than 150 N/m shall all be seismically fortified' | 7.1.2 | shall |
| Suspended equipment | 'Equipment within suspended piping with gravity over 1.8 kN' | 3.1.6 commentary item 1 | shall |
3. Combined-use and substitution boundaries between seismic supports and ordinary load-bearing supports
- Term definition (GB 50981-2014 clause 2.1.6): 'Seismic support and hanger (seismic bracing): a seismic supporting installation firmly connected to the building structure, taking seismic force as its principal load. It consists of anchors, reinforced hanger rods, seismic connection members and seismic diagonal braces.' - taking seismic force as the principal load differs in load nature from ordinary load-bearing supports and hangers that take gravity as their principal load, so ordinary load-bearing supports cannot meet the fortification requirements and must not substitute for seismic supports and hangers.
- Functional requirement (clause 8.1.1): 'Seismic supports and hangers shall give reliable protection to building MEP installations in an earthquake and resist seismic action from any horizontal direction.'
- With anti-sway supports: clause 4.1.2 item 3 provides that fire systems such as indoor sprinkler and gas extinguishing systems 'shall also be provided with anti-sway supports as required by the relevant construction and acceptance codes; where a pipe section has coincident seismic and anti-sway supports, seismic bracing alone may be provided' (commentary: the two functions are similar, avoiding duplication while ensuring safety in use).
- Merging with gravity supports: DBJ 46-059-2021 clause 8.1.5 provides that 'seismic supports and hangers should preferably carry both seismic action and gravity. Where a seismic support and hanger coincides in position with a gravity support, if the seismic support can carry the gravity of the MEP installation there, the seismic support alone may be used, but the seismic verification and the gravity calculation sheet for that support must be provided'; where the requirements are met, merging the two saves material and installation cost.
- No cross-use of supports: DB11/T 1810-2020 clause 5.3.2: 'The support of a branch pipe (branch tray) must not serve as the seismic support of the main pipe (main tray). Where seismic and anti-sway supports coincide, the seismic support alone may be provided.' Inspection covers all items, by observation.
4. Layout points after fortification (GB 50981-2014 chapter 8)
- Transverse: each section of horizontal straight piping shall have transverse seismic supports and hangers at both ends (8.3.1).
- Longitudinal: each section of horizontal straight piping shall have at least one longitudinal seismic support and hanger; where the distance between two longitudinal supports exceeds the maximum design spacing, further supports are added in sequence per the spacings of clause 8.2.3 (8.3.3).
- Bends: horizontal piping shall have a transverse seismic support within 0.6 m of a bend; where the diagonal brace acts directly on the pipe, it may serve as the longitudinal seismic support of the pipe on the other side, with the spacing to the next longitudinal support calculated by the formula of clause 8.3.6 (where L1 is the longitudinal support spacing and L2 the transverse support spacing).
- Spacing (8.2.3): l is the transverse and longitudinal seismic support spacing on horizontal piping, l0 the maximum support spacing (per Table 8.2.3); alphaEk is the combined horizontal seismic force coefficient, taken as 1.0 when below 1.0; k is the seismic brace angle adjustment factor - 1.00 where the ratio of vertical to horizontal brace length is 1.00, 1.67 where no more than 1.50, and 2.33 where no more than 2.00. Note: in alteration works the maximum seismic strengthening spacing is half the tabulated value.
- Single pipe (rod) (8.3.14): the horizontal pipe connecting a riser shall have its first seismic hanger within 0.6 m of the riser; risers over 1.8 m long shall have four-way seismic supports at top and bottom, and over 7.6 m a further one in between; where a riser passes through structural floors in a sleeve, a seismic support may be provided (the sleeve restrains horizontal displacement and may serve as a four-way support in the horizontal direction); accessories installed in the piping with a self mass over 25 kg shall have transverse and longitudinal seismic supports.
- Portal type (8.3.15): at least one transverse seismic brace or two longitudinal braces; where one load-bearing hanger carries multiple layers of portal hangers, each load-bearing hanger shall be strengthened independently and fitted with seismic diagonal braces; transverse and longitudinal braces shall be installed at the upper beam or at the load-bearing hanger connection; where a piping accessory over 25 kg is rigidly connected to the pipe, or an accessory of 9 kg to 25 kg is flexibly connected, transverse and longitudinal seismic braces shall be provided.
- Associated construction: piping shall not pass through seismic joints; where crossing is unavoidable it should cross near the lower part of the building, with one flexible pipe joint on each side of the joint or a portal bend or expansion joint provided; where pipes pass through internal walls or floors, sleeves shall be provided and the gaps sealed with flexible fire-resistant material; in intensity 8 and 9 areas, water inlet pipes and drainage outlet pipes passing through basement external walls shall have waterproof sleeves (4.1.2 items 4~6). Ducts shall not pass through seismic joints; where crossing is unavoidable, one flexible connection on each side of the joint; where ducts pass through internal walls or floors, sleeves shall be provided and filled with flexible fire-resistant material (5.1.3 items 1 and 2). In intensity 8 and 9 areas, where water and drainage risers of high-rise buildings exceed 50 m in straight length, measures against earthquake-induced vibration are recommended (e.g. bellows expansion joints), and over 100 m such measures shall be taken (4.1.2 item 1).
Applicability boundaries
- Strength-word differences must be checked, as they directly affect design and pricing scope: the duct clause (5.1.3 item 3) reads 'may use seismic supports and hangers', while the commentary on 3.1.6 lists duct systems of the same sizes among those 'requiring seismic fortification'; smoke control and exhaust ducts, emergency ventilation ducts and equipment (5.1.4) 'shall use' them. Local standards often upgrade ducts to 'shall'; in actual projects the prevailing local standard and the design documents at the project location decide 'shall / may' after verification.
- Non-application: GB 50981-2014 does not apply to building MEP works at intensities above 9 or with special requirements; such works require special design and demonstration. Seismic design of the equipment itself is outside the scope of this code.
- Exemption determination below intensity 6: the mandatory starting point of GB 50981-2014 is 'intensity 6 and above'; below that gate it is technically not mandatory. But per the commentary on GB 55002-2021 clause 1.0.2, under the Seismic Ground Motion Parameter Zonation Map of China GB 18306-2015 the basic seismic intensity nationwide is intensity 6 and above, and fortification from intensity 6 onwards was a major decision of the construction authorities after the Tangshan earthquake and the premise of all seismic technical standards; in practice there are essentially no 'unfortified areas', and the governing intensity is that listed in the general notes of the structural design on the construction drawings. Genuine exemption occurs only at component level: equipment with gravity not more than 1.8 kN and piping suspended on rods of calculated length not more than 300 mm may be left unfortified (3.1.6).
- Currency of provisions: when citing the overall threshold, GB 55002-2021 clauses 1.0.2 and 5.1.12 are the current mandatory basis (from 1 January 2022); GB 50981-2014 clauses 1.0.4 and 5.1.4 are superseded; but GB 50981-2014 clauses 3.1.6, 4.1.2, 5.1.3, 6.1.1 and 7.1.2 and chapter 8 (layout and spacing calculation) remain the dedicated basis for threshold determination and layout calculation of seismic supports and hangers.
- The thresholds in this card are general rules at the provision-determination level; a specific project still requires seismic action calculation and section capacity verification to the actual gravity of the equipment and piping, the component sizes and the brace angles.
Further reading
- GB 50981-2014 Code for seismic design of building MEP works: chapter 1 general provisions (1.0.2, 1.0.4), chapter 2 terminology (2.1.6), chapter 3 basic design requirements (3.1.6 and its commentary), chapter 4 water supply and drainage (4.1.2), chapter 5 HVAC (5.1.3, 5.1.4), chapter 6 gas (6.1.1), chapter 7 electrical (7.1.2), chapter 8 seismic supports and hangers (8.1.1, 8.2.3 and Table 8.2.3, 8.3.1, 8.3.3, 8.3.6, 8.3.14, 8.3.15 and figures 19, 21, 23 and 24).
- GB 55002-2021 General code for seismic design of buildings and municipal engineering: clause 1.0.2 (scope and whole-process requirements, including implementation and inspection control: check whether the codes listed in the general notes of the structural design include this and other seismic codes) and clause 5.1.12 (fortification requirements and countermeasures for non-structural components and attached MEP equipment).
- GB 50011-2010 Code for seismic design of buildings, clauses 1.0.2 and 3.7.1 (non-structural components, including building non-structural components and attached MEP equipment, themselves and their connections to the main structure, shall be seismically designed) - the overriding basis cited in the commentary on GB 50981-2014 clause 1.0.4.
- GB 18306-2015 Seismic ground motion parameter zonation map of China (basic intensity values); Regulations on Quality Management of Construction Works (State Council Decree No. 279), Articles 3, 15 and 69 (constraints and penalties on the responsible parties and on use activities such as fitting-out).
- Local standards: DBJ 46-059-2021 clause 8.1.5 (conditions and verification calculation sheets for seismic supports also carrying gravity), DB11/T 1810-2020 clause 5.3.2 (branch supports must not serve as main-line seismic supports; treatment of coincident seismic and anti-sway supports and the inspection method).
Keywords
- 抗震支吊架
- GB 50981-2014
- GB 55002-2021
- 抗震设防烈度6度
- DN65
- 内径60mm电气配管
- 150N/m电缆桥架
- 0.38平方米风管
- 防晃支架