Measurement rules for earthworks backfill, haulage and special-case excavation: foundation / room / basement-interior / site backfill, the enlargement zone for excavation between piles, and off-site slurry ratios (per DB11/T 2382-2024 section 4.2)

Excavation and haulage are measured by the natural in-situ volume before excavation; backfill by the as-completed volume after backfilling. Foundation backfill = excavation volume - the volumes of foundations, buildings, structures and blinding buried below the designed exterior ground level; room backfill = area between main walls (less heating trenches, cable trenches, drainage trenches and equipment foundations) x (height from the designed exterior ground level to the underside of the first-floor blinding); site backfill = backfill area x backfill thickness; haulage quantity = total excavated volume - total backfill volume. Excavation between piles covers all soil within 1.20m beyond the outer edges of piles / anti-floating anchors / pile caps, or within zones where adjacent outer edges are no more than 4m apart, between the pile-top level (effective pile length plus the design over-cast length) and the underside of the blinding (or cushion), less the volumes of pile bodies and empty bores. Slurry hauled off site: mixing piles, grouting piles, anchors, anchor cables and soil nails at 10% of the formed pile or bore volume; diaphragm walls, trench-cutting cement-soil walls and cast-in-place piles at 50% of the formed pile volume.

Applicable Codes

  • DB11/T 2382-2024 第4.2.5~4.2.7、4.2.9~4.2.14、4.2.18、4.2.19、4.2.21~4.2.27
  • TB/T 10831-2024 Vol. 10 房屋工程 册说明十一(一)表4
  • GB/T 50854-2024 App. A 土石方工程
  • 湖南省2025版房屋建筑与装饰工程消耗量标准 土石方说明六、九、十一
  • 江苏省2026版建筑与装饰工程消耗量定额 土石方说明

Topic positioning

Among earthworks quantities, this card covers backfill, haulage, excavation between piles, silt and flowing sand, and slurry hauled off site - quantities governed not by slope formulas but by dedicated measurement rules. The primary basis is Beijing DB11/T 2382-2024 section 4.2, compared with railway TB/T 10831-2024 and the Hunan 2025 consumption standard on volume and ratio criteria.

Core conclusions

Volume basis: excavation and haulage items are measured by the natural in-situ volume before excavation; backfill is measured by the as-completed volume after backfilling (TB/T 10831-2024 volume notes XI (1)). Volumes in different states are converted by volume conversion factors; excavation volume (natural in-situ) and backfill volume (compacted) must never be added or subtracted directly to derive truck loads.

1 Site levelling: measured by the gross floor area of the building first storey as shown on the design drawings; where the single-storey gross floor area of the basement exceeds that of the first storey, the largest single-storey basement gross floor area governs (DB11/T 2382-2024 4.2.12). 2 Site rolling and compaction of in-situ soil: measured by the area rolled or tamped as shown (4.2.13). Machine-excavated isolated earthworks are measured by volume from the drawn dimensions (4.2.14). 3 Excavation between piles (4.2.18): measured by volume as all soil within 1.20m beyond the outer edges of the various piles, anti-floating anchors or pile caps, or within zones where the distance between adjacent outer edges is no more than 4m, between the pile-top level (effective pile length plus the design over-cast length) and the underside level of the designed foundation blinding or cushion; the volumes of pile bodies and empty bores shall be deducted. Enlargement and deduction of pile bodies must be applied together - enlarging without deducting pile bodies is double counting. 4 Excavation of silt and flowing sand (4.2.19): measured by volume at the positions and limits shown on the design; its haulage is measured by the excavation volume (4.2.26). 5 Foundation backfill (4.2.21): measured as excavation volume less the volumes of foundations, buildings, structures and blinding buried below the designed exterior ground level. 6 Room backfill (4.2.22): measured by volume as the area between main walls, less the areas of heating trenches, cable trenches, drainage trenches and the like and equipment foundations, multiplied by the height from the designed exterior ground level to the underside of the first-floor blinding. Note the deductions target areas and the datum is the designed exterior ground level - not the interior floor level or the top of blinding. 7 Backfill inside basements (4.2.23): by volume from the drawn dimensions. Site backfill (4.2.24): by volume as backfill area x backfill thickness. 8 Haulage quantity (4.2.25): total excavation volume less total backfill volume (i.e. surplus spoil hauled off site under the native-soil backfill basis; with full replacement the deduction is zero). 9 Slurry hauled off site (4.2.27): for mixing piles, grouting piles, anchors, anchor cables and soil nails, the slurry quantity is 10% of the formed pile or bore volume; for diaphragm walls, trench-cutting cement-soil walls and cast-in-place piles it is 50% of the formed pile volume. 10 Line-item application (4.2.9, 4.2.10): machine-excavated soil loaded and hauled at once follows the machine excavation and soil haulage items; secondary handling follows the soil loading and soil haulage items. Where backfill soil is stockpiled off site and hauled back when needed, a separate item need not be set: consumption follows soil loading combined with soil haulage, but the material consumption shall exclude spoil or residue disposal quantities. 11 What the consumption excludes (4.2.5, 4.2.6): earthworks consumption shall not include treatment of above-ground and underground obstructions or clearance of demolition debris; rock works consumption should be measured separately by breaking method and shall include the code-permitted over-excavation. Where rock excavation for vertical site layout or hillside rock cutting is thicker than 300mm, the general rock excavation items apply (4.2.7).

Regional / industry differences: Hunan 2025 building and decoration consumption standard - the extra earthworks for pipe-joint working pits and the various chambers along the route are taken as 2.5% of all trench earthworks; rock quantities are the drawn dimensions plus permitted over-excavation, with per-side allowances on excavated slopes of 0.20m for soft and fairly soft rock and 0.15m for fairly hard and hard rock, none counted at trench and pit bottoms. Beijing treats over-excavation as included in the rock consumption; Hunan adds it to the dimensions - the two must not be mixed.

Applicability boundaries

  • Clause values and criteria follow DB11/T 2382-2024 (Beijing consumption standard); other regions and industries differ on chamber increments (Hunan 2.5%), permitted over-excavation and whether over-excavation sits inside the item - cross-system borrowing is barred; confirm the applicable standard before pricing.
  • The 10% / 50% slurry ratios are quantities given by the consumption standard, not measured slurry volumes; strata and borehole-support methods shift actual volumes; where the contract stipulates otherwise, the stipulation governs.
  • Backfill measured as as-completed (compacted) volume and excavation as natural in-situ volume are two states; earthworks balances, truck trips and spoil disposal declarations must convert by volume conversion factors first.
  • The haulage identity 'total excavation - total backfill' presupposes native-soil backfill; with replacement, bought-in soil or off-site stockpiling and return haul, apply the 4.2.10 basis and exclude spoil disposal from material consumption.
  • Excavation between piles applies only to soil at piles, anti-floating anchors and pile caps; it is a separate basis from the boring (including empty bores) and empty-pile pricing rules of the piling work itself - apply each on its own.

Further reading

  • DB11/T 2382-2024 Consumption standard for construction works, clauses 4.2.5, 4.2.6, 4.2.7, 4.2.9, 4.2.10, 4.2.11 to 4.2.14, 4.2.18, 4.2.19, 4.2.21 to 4.2.27 (full rules for backfill, haulage, excavation between piles and off-site slurry).
  • TB/T 10831-2024 Railway Works Budget Quota Manual Volume 10 Building Works, volume notes XI (1) and table 4 (earthworks volume conversion factors: bulk / loose fill / natural in-situ / compacted).
  • GB/T 50854-2024 Standard for quantity take-off of building and decoration works, appendix A earthworks (BOQ and quota bases tracked separately).
  • Hunan 2025 building and decoration consumption standard, earthworks notes VI, IX, XI (trench lengths, 2.5% chambers, rock over-excavation allowances).
  • Jiangsu 2026 building and decoration consumption quota, earthworks notes (trench / pit division, rules for merging pipe-trench and chamber soil) as a regional comparison.