disposal of surplus (excavated) material
- 01
Earth and rock haulage pricing: haul distance measured as the nearest distance from the excavation centroid to the fill or spoil centroid, on-site transport already included in excavation line items, off-site transport listed separately as disposal of surplus material and banded as basic haul plus increments, the loading charge taken only once, and hoisting soil from deep excavations charged separately as vertical transport
Earth and rock haul distance is measured as the shortest and nearest dis…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. A A.4.13 余方弃置GB/T 50857-2024 市政工程工程量计算标准 App. A A.4.6 土石方工程湖南2025 房屋建筑与装饰工程消耗量标准 第一章 土石方工程 说明 十三(土方运输)2026-10-25 - 02
Measurement rules for earthworks backfill, haulage and special-case excavation: foundation / room / basement-interior / site backfill, the enlargement zone for excavation between piles, and off-site slurry ratios (per DB11/T 2382-2024 section 4.2)
Excavation and haulage are measured by the natural in-situ volume before…
DB11/T 2382-2024 第4.2.5~4.2.7、4.2.9~4.2.14、4.2.18、4.2.19、4.2.21~4.2.27TB/T 10831-2024 Vol. 10 房屋工程 册说明十一(一)表4GB/T 50854-2024 App. A 土石方工程2026-10-25 - 03
BOQ itemisation and measurement wording for earthworks under GB/T 50854-2024 Appendix A: item setting and codes for excavation, backfill, disposal of surplus material, borrowed-soil backfill and site levelling; the two ledgers of natural in-situ volume versus compacted volume; the balance formula; pricing splits; and the listing boundary of vertical cut-and-fill
GB/T 50854-2024 Appendix A splits earthworks into three sections: standa…
GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. A Table A.1.1(010101)、Table A.2.1(010102)、Table A.3.1(010103)及 A.4.10~A.4.13GB/T 50857-2024 · Standard for Measurement of Quantities of Municipal Works App. A Table A.3.1 回填方及余方弃置(040103)JGJ/T 498-2024《施工现场建筑垃圾减量化技术标准》第 4.0.2 条及表 22026-10-25 - 04
Earthwork excavation quantity take-off (measurement): working space width, slope coefficients, and haulage (disposal of surplus excavated material) quantities
Earthwork excavation quantity take-off (measurement) follows the three-l…
GB/T 50854-2024TB/T 10831-2024SJG 111.1-20222026-09-25 - 05
Confirming spoil haul distance in municipal earthwork: centroid method, confirmation priority, and quota norms structure
Spoil haul distance = the shortest distance along the actual transport r…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 A.4.13GB/T 50857-2024 市政工程工程量计算标准SJG 84-2020 市政维修工程消耗量标准 第二册 6.1.17、7.1.172026-09-25 - 06
Disallowance grounds on final-account review for double counting of earthwork haul distance: the all-in unit rate cost envelope under GB/T 50500-2024 + the "disposal of surplus (excavated) material" itemisation basis in the measurement standards
Earthwork loading and haulage costs are already included in the correspo…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准2026-09-25 - 07
Composition, charging and cost attribution of spoil-site costs and residue disposal fees (tipping fees)
Spoil-site costs are costs arising around the "site" (temporary land occ…
SJG 86-2020建设部令第139号 城市建筑垃圾管理规定GB/T 50857-20242026-09-25