Earth and rock haulage pricing: haul distance measured as the nearest distance from the excavation centroid to the fill or spoil centroid, on-site transport already included in excavation line items, off-site transport listed separately as disposal of surplus material and banded as basic haul plus increments, the loading charge taken only once, and hoisting soil from deep excavations charged separately as vertical transport
Earth and rock haul distance is measured as the shortest and nearest distance between the centroid of the excavated (or demolished) material and the centroid of the fill area or the spoil (stockpile) area, the centroid positions being fixed by the approved project execution plan; it means the shortest distance along a traversable haul route, not the straight line between two points. The work content of excavation BOQ items includes only on-site transport; off-site haul must be listed separately as 'disposal of surplus material' (covering loading and haul from the site to the disposal point), and the quota bands it as 'basic haul + increments' (manual cartage with a 20m basic band plus 10m/20m increments; mechanical cartage with a basic band within 1km plus 1km per increment; loader loading and carting of loose soil applying only within 20m). Loading and haul may be split into processes, but the loading charge may be taken only once, in either the excavation or the haul item (excavation 'without loading' line items are converted from the loading line item by coefficient 0.80). Hoisting soil from deep excavations beyond the set depth (commonly 2m) is charged separately as vertical transport at 7m of horizontal haul per metre of depth, but dedicated line items such as large strutted excavations and excavation within bracing already include vertical hoisting and take no further charge.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. A A.4.13 余方弃置
- GB/T 50857-2024 市政工程工程量计算标准 App. A A.4.6 土石方工程
- 湖南2025 房屋建筑与装饰工程消耗量标准 第一章 土石方工程 说明 十三(土方运输)
- 湖南2025 市政工程消耗量标准 土石方工程 说明(垂直运输、大型支撑基坑土方)
- SJG 111.1-2022 城市地下综合管廊工程消耗量标准(Vol. 1)第1.2.10条及Table 1.2.10
- SJG 84-2020 市政维修工程消耗量标准 第二册 第7.2.9条、第6.1.17条
- DB11/T 2382-2024 建设工程施工消耗量标准 第4.2.5、4.2.8~4.2.11、4.2.25~4.2.27、7.1.16~7.1.20条
- DB63/T 2013-2022 公路养护工程预算定额 App. A A.2.1.3
- TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程 Ch. 1说明及LY-20~LY-31子目
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 册说明 六
- GB 51004-2015 建筑地基基础工程施工规范 第8.4.1条
Topic positioning
Three things in earth and rock haulage pricing: how the distance is measured (centroid method), how on-site and off-site are split (work-content boundary plus disposal of surplus material), and how consumption is built up (basic haul plus incremental banding, the split of loading and haul, the vertical transport exception). It covers the building, municipal and railway quota bases.
Core conclusion
1. Haul distance measurement rules (original basis)
- Hunan 2025 consumption standard for building and decoration works, chapter 1 notes, item 13: earth transport is measured in natural in-situ volume; '1. Total excavation volume minus backfill (converted to natural in-situ volume): where the total is positive, the surplus is hauled off site; where negative, soil is imported. 2. The earth and rock haul distance is the shortest distance between the centroid of the excavation area and the centroid of the fill (or stockpile) area.'
- SJG 111.1-2022 clause 1.2.10: 'Earth and rock haul distance shall be the nearest distance from the excavation centroid to the fill centroid or the spoil centroid, the excavation centroid, fill centroid and spoil centroid being fixed by the project execution plan. Where a bulldozer climbs loaded at a gradient above 5%, or manual and hand-cart haulage of earth and rock climbs at a gradient above 15%, the distance is the sloped length of the gradient section multiplied by the coefficient shown in Table 1.2.10.'
- SJG 84-2020 volume 2, clause 7.2.9 item 4: 'The haul distance of earth and spoil residue shall be the nearest distance from the centroid of the excavated or demolished material to the centroid of the spoil; the excavation centroid, fill centroid and stockpile centroid are fixed by the project execution plan.'
- Reading of the basis: 'shortest and nearest distance' is the shortest distance along a traversable haul route (following site tracks and municipal roads), not a two-point straight line ignoring hoarding, existing buildings or one-way restrictions; the centroid is the centre of mass of the excavated and filled volumes, not the geometric centre of the cut area. Fixing centroids and routes in the approved project execution plan is the precondition for a measurable haul distance and the evidentiary basis at final account.
2. The three-layer split between on-site and off-site transport
- BOQ layer: GB/T 50857-2024 Appendix A A.4.6 - the work content of the trench, pit, general earth and rock, mined earth and slurry excavation BOQ items 'includes only on-site transport of earth and rock; where off-site haul of earth and rock is needed, the item may be listed under the disposal of surplus material item code'; GB/T 50854-2024 Appendix A A.4.13 - 'disposal of surplus material covers the loading and haul of earth and rock from the construction site to the designated disposal point, and shall meet the national and local requirements of the construction administration on the acceptance and disposal of construction waste.'
- Quota layer: the on-site haul distance built into the work content of excavation and dig-and-load line items (5m, 20m, tipping within 5m of the trench or pit edge, etc., varying by volume) must not be charged again as haul. Hunan 2025 municipal consumption standard: for manual and small-plant vertical haulage 'the work content above all includes loading, carting, and tipping within 5m of the trench or pit edge'. Off-site haul is charged only beyond the site exit, banded as 'basic haul + increments'.
- Temporary stockpiling and re-haul charged separately: DB11/T 2382-2024 clause 4.2.10 - backfill temporarily stockpiled off site and hauled back when needed may be set up without a separate item, consumption following 'soil loading + soil haul', but the material consumption shall not include spoil or residue disposal quantities; clause 4.2.9 - load-and-go machine-excavated soil follows 'machine-excavated soil + soil haul', and second-handling of soil follows 'soil loading + soil haul'; clause 7.1.16 - where soil is loaded and carted away immediately, the soil loading item is not applied.
- Beyond the quota coverage: DB63/T 2013-2022 Appendix A A.2.1.3 - the dump-truck subgrade haul quota applies only to an average distance within 15km; beyond 15km, the cost follows the relevant rules for social haulage; and 'where the distance exceeds the first quota distance unit, a remainder under half an increment unit is ignored, and one equal to or above half is counted as one full increment unit'; TB/T 10822-2024 volume 1, chapter 1 notes - earth and rock haulage already allows for road factors (haul roads, traffic interference and the like), the truck increment quota applies only to haulage of 10km or less, and the part beyond 10km is multiplied by a coefficient of 0.85.
- Quantity basis: excavation and haul are measured in the pre-excavation natural in-situ volume (DB11/T 2382-2024 clause 4.2.11); the off-site haul volume = total excavation - total fill (clauses 4.2.25 and 7.1.17); SJG 84-2020 clause 7.2.9 item 3: with backfill of on-site soil, the surplus hauled off site may be excavation volume minus backfill volume; with replacement fill, the surplus hauled off site equals the excavated volume; item 5: the line items already allow comprehensively for the bulking factor, and no separate bulking factor is added to the quantities.
- Special proportions for slurry haul: DB11/T 2382-2024 clause 4.2.27 - mixing columns, grouting columns, anchors, anchor cables and soil nails at 10% of the formed column or bore volume; diaphragm walls, trench-cut soil-cement walls and bored piles at 50% of the formed volume; clause 7.1.19 - slurry-balance pipe jacking at 50% of the volume of the structure.
3. Banding and applicability boundaries of manual and mechanical cartage
- Manual cartage = short distances, low basic band plus fine increments. TB/T 10822-2024 volume 1 manual dig-and-cart line items LY-26 to LY-31: within 20m is the basic line item (work content 'haul distance within 20m, including dig, break up, load, cart, tip and return empty'), with a 10m increment line item (work content '10m extra haul, including cart and return empty'), split by loose soil, common soil and hard soil.
- Mechanical cartage = basic band within 1km plus 1km increments. TB/T 10822-2024 volume 1 dump-truck line items LY-20 to LY-25: banded by dump trucks up to 8t, up to 15t and up to 25t; within 1km is the basic line item (work content 'haul distance within 1km, including waiting, assisting loading, cart, tip and return empty'), with a 1km increment line item; DB11/T 2382-2024 clause 4.2.8 - the construction consumption of earth and rock haulage should be measured by distance band, the starting distance being measured comprehensively within 1km, the excess in steps of 1km; SJG 84-2020 clause 6.1.17 - where dredging haul exceeds 1km and the 1km increment line item is applied, any part under 1km counts as 1km.
- The boundary between the two: TB/T 10822-2024 volume 1, chapter 1 notes - 'loader loading and carting of loose soil applies only to loading, carting and tipping of loose soil within a range of 20m; beyond 20m dump trucks shall be used'. Within 20m, load-cart-tip may be manual or by loader; once truck haulage begins, the mechanical cartage bands apply.
4. The loading charge must not be double counted
- Hunan 2025 consumption standard for building and decoration works: excavator excavation of trench and pit soil 'without loading' is the 'with loading' item multiplied by a coefficient of 0.80 - with loading and without loading are mutually exclusive options; taking the with-loading item already includes loading, and charging loading again on a without-loading item is double counting.
- DB11/T 2382-2024 clauses 4.2.9 and 7.1.16: load-and-go haul follows 'dig + cart' (the municipal basis applies no soil loading item); soil re-handling and second handling follow 'loading + haul' - the same soil takes loading in exactly one stage.
- Build-up split rule: loading (excavator loading) and haul (dump-truck cartage) are two processes and may be listed separately, but the same soil takes loading only once; the work content of the dump-truck line item is only 'waiting and assisting loading', excluding excavator loading, so where the excavation line item is compiled without loading, the loading charge sits in the haul (or re-handling) stage through the loading line item; where the excavation line item is already compiled with loading, the haul side takes no further loading.
5. The vertical transport exception (hoisting soil from deep excavations)
- Hunan 2025 municipal consumption standard: for manual vertical haulage, a vertical transport charge applies beyond 2m depth, the excess being applied at 7m of horizontal haul per metre of depth to the relevant manual cartage, sludge and rock spoil 20m increment line items, depth counted over the full height; for vertical haulage by small plant such as electric hoists and winches, the charge likewise applies beyond 2m depth, the excess being converted to 7m per metre and applied to the relevant line items multiplied by 0.8.
- SJG 84-2020 clause 6.1.17: where sludge is actually hauled vertically by manual effort, the distance counts as 7 times the horizontal equivalent; TB/T 10831-2024 volume 10 building works, volume notes: manual vertical soil haul is executed at 1.50 x the consumption of the relevant manual cartage line items, the haul distance being measured along the vertical haul.
- Counter-example (hoisting already included, no further charge): the Hunan 2025 municipal 'excavation of large strutted excavations' line item suits deep excavation with spans over 8m retained by bored piles, secant piles, diaphragm walls, deep soil-mixing columns, concrete sheet piles, steel sheet piles and the like; that line item 'already allows comprehensively for all methods of vertical soil haul and is not adjusted for differences of construction method'; DB11/T 2382-2024 clause 4.2.4 - the construction consumption for excavation within inner bracing shall include vertical hoisting and the like in its work content.
- Another depth-driven adjustment (do not confuse with vertical transport): Hunan 2025 building - machine-excavated earth and rock is compiled for 5.0m depth below natural ground; the part deeper than 5.0m and within 15.0m may take the labour and plant of the relevant items multiplied by a coefficient of 1.20, and beyond 15.0m the cost is calculated from the special construction scheme approved through expert review.
6. The effect of gradients and climbing on haul distance
- Distance to be lengthened: SJG 111.1-2022 clause 1.2.10 - where a bulldozer climbs loaded above a gradient of 5%, or manual and hand-cart haulage of earth and rock climbs above 15%, the distance is the sloped length of the gradient section multiplied by the coefficient of Table 1.2.10; Hunan 2025 building, same basis (bulldozer pushing of soil, rock spoil or scraper carting of soil climbing above 5%: sloped length of the gradient section multiplied by the coefficient).
- Already included, no further charge: TB/T 10831-2024 volume notes item 6 - the inefficiency of loaded climbs by manual effort, hand carts and trucks (gradients up to 15%) is already comprehended in the relevant transport items and not calculated separately; for loaded climbs by bulldozers and loaders, the inefficiency is the sloped length of the ramp multiplied by the relevant coefficient of Table 3. Always check first whether the volume notes already comprehend it, to avoid double coefficients.
Applicable boundaries
- Basic haul and increment steps differ by industry, region and volume (manual: 20m basic band, 10m or 20m increments; mechanical: basic band within 1km, 1km steps); always follow the general notes, chapter notes and line-item tables of the quota in force, and never copy across volumes.
- Where the contract or BOQ has agreed a lump-sum haul, a spoil site location or a surplus disposal haul (item description), the contract governs and the centroid method no longer applies; a change of spoil site must be certified promptly with evidence (haul contracts, weighbridge slips, GPS traces, disposal site receipts).
- Earth and rock consumption generally excludes treatment of overhead and underground obstructions and clearance of debris after demolition (DB11/T 2382-2024 clause 4.2.5); that part must not be folded into haul pricing.
- Keep apart the three 'weight-class' variables: volume (natural in-situ volume, excavation minus fill), distance (nearest centroid route, banded) and process (loading, haul and vertical hoisting each to its own home) - they are mutually independent and cannot be replaced directly by truck counts, bulked volume or actual mileage.
- Not applicable: municipal dredging maintenance (silt and dredging haul follows the basis of SJG 84-2020 clause 6.1.17); the vertical transport preliminaries of tower cranes and builder's hoists (part of the preliminaries pricing system, a different concept from the separate charging of deep-excavation hoisting).
Further reading
- GB/T 50854-2024 Appendix A A.4.13 disposal of surplus material; GB/T 50857-2024 Appendix A A.4.6 (excavation work content includes on-site transport only)
- Hunan 2025 consumption standard for building and decoration works, chapter 1 earth and rock works, notes item 13 (centroid rule, original text), and the conversion coefficient for excavator trench and pit excavation 'without loading'
- Hunan 2025 municipal consumption standard, earth and rock works notes (vertical transport converted to 7m of horizontal haul, tipping within 5m of the pit edge, scope of the large strutted excavation line item)
- SJG 111.1-2022 consumption standard for urban utility tunnel works (volume 1), clause 1.2.10 and Table 1.2.10 gradient adjustment coefficients
- SJG 84-2020 consumption standard for municipal maintenance works (volume 2), clause 7.2.9 items 3 to 5 (deduction rules, bulking factor), clause 6.1.17 (dredging haul, vertical distance 7x, under 1km counts as 1km)
- DB11/T 2382-2024 consumption standard for construction works, clauses 4.2.5, 4.2.8 to 4.2.11, 4.2.25 to 4.2.27; clauses 7.1.16 to 7.1.20
- DB63/T 2013-2022 budget quota for highway maintenance, Appendix A A.2.1.3 (the 15km limit, the half-increment rounding rule)
- TB/T 10822-2024 railway budget quota, volume 1 subgrade works, chapter 1 notes (loader 20m, increment beyond 10km x 0.85) and line items LY-20 to LY-25 (dump-truck cartage), LY-26 to LY-31 (manual dig and cart)
- TB/T 10831-2024 railway budget quota, volume 10 building works, volume notes item 6 (manual vertical haul x 1.50, loaded-climb inefficiency already comprehended)
- GB 51004-2015 code for construction of building foundations, clause 8.4.1 (earth balance, shortest reasonable haul, minimising double handling)
Keywords
- 土石方运距
- 重心法
- disposal of surplus (excavated) material
- 场内运输
- 每增运
- 自卸汽车运土
- 装车费
- 垂直运输