Stage positioning of highway investment estimates: an important part of the project proposal and the engineering feasibility study report (JTG 3820-2018 Clause 1.0.3), with the correspondence to estimates, budgets, and "two-stage design" and confusable points

Verbatim from Clause 1.0.3 of JTG 3820-2018 "Measures for compiling investment estimates of highway engineering construction projects": "The investment estimate is an important part of the project proposal and the engineering feasibility study report." The investment estimate is a cost document of the early (pre-construction) stage of the capital construction procedure, forming with the preliminary-design estimate and the construction-drawing budget the layer-by-layer chain "estimate -> design estimate -> budget" (estimate-stage cost <= investment estimate; budget <= estimate); note that the usual "two-stage design" means preliminary design + construction-drawing design (with estimate and budget as their cost documents), while the investment estimate corresponds to the early-stage documents — the two must not be confused.

Applicable Codes

  • JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第1.0.3条
  • JTG/T 3821 · Estimate Indicators of Highway Engineering
  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects

Topic Positioning

This card explains the stage positioning of the investment estimate under the "Measures for compiling investment estimates of highway engineering construction projects" (JTG 3820-2018): the investment estimate is an important part of the project proposal and the engineering feasibility study report; it also clarifies the correspondence with the preliminary-design estimate, the construction-drawing budget, and "two-stage design", and the confusable points. For compiling, reviewing, and compliance-checking investment estimates of new and rebuild (extension) highway projects.

Core Conclusions

Verbatim from Clause 1.0.3 of JTG 3820-2018: "The investment estimate is an important part of the project proposal and the engineering feasibility study report." Both stages belong to the early work of the capital construction procedure — the project proposal is the basis for project approval, the feasibility study the basis for decision. Related provisions:

  • Compilation scope (Clause 1.0.2): these measures apply to compiling investment estimates of new and rebuild (extension) highway projects.
  • Compilation requirements (Clause 1.0.4): based on the design documents, fully understand local construction conditions, master the basic data, correctly cite indicators, fee standards, labor unit prices, and material and equipment prices, and compile per these measures.
  • Sectioning and summary (Clause 1.0.5): multi-section compilations shall unify principles and summarize into the total project investment estimate; connecting lines, branch lines, and larger access and connector works shall be estimated separately and summarized.
  • Consumption basis (Clause 2.1.1): compute labor/material/plant costs from the consumptions of the current "Highway engineering estimation indicators" (JTG/T 3821) and the project-location labor shift price, material budget price, and plant shift price per these measures, then compute each fee per these measures.
  • Stage correspondence of cost documents: investment estimate (project proposal / feasibility study) -> estimate (preliminary design) -> budget (construction-drawing design), each layer controlling (estimate-stage cost <= investment estimate; budget <= estimate). Confusable point: the usual "two-stage design" means preliminary design and construction-drawing design, whose cost documents are the estimate and the budget; the investment estimate corresponds to the early-stage documents and is not part of the "two-stage design".

Applicable Boundaries

  • Objects: investment estimates of new and rebuild (extension) highway projects; compilation shall also comply with current national and industry standards (Clause 1.0.8).
  • Uncovered specialties: for works not covered by these measures and the indicators, the cost of works (construction and installation) may follow the relevant industry quotas (Clause 1.0.6).
  • Regional supplements: provincial transport authorities may issue supplementary provisions (Clause 1.0.7).
  • Not applicable: highway estimates and budgets follow JTG 3830-2018; this card does not cover their specific charging rules (measures costs, profit, tax rates, etc.).

Further Reading

  • JTG 3820-2018 Clauses 1.0.1-1.0.8 (general provisions), 2.1 (basic provisions), 2.2 (compilation basis).
  • Companion indicators: "Highway engineering estimation indicators" (JTG/T 3821), 2018 edition issued with JTG 3820-2018 and effective 1 May 2019; investment-estimate consumptions are taken from it.
  • Estimate/budget stage comparison: JTG 3830-2018 — document composition and charging systems interlock across stages.
  • Core evidence: the verbatim Clause 1.0.3 of JTG 3820-2018 (current, effective 2019-05-01).

Keywords

  • feasibility-stage cost estimate
  • 项目建议书
  • 工程可行性研究报告
  • JTG 3820
  • 公路工程投资估算编制办法
  • 两阶段设计
  • 概算
  • 预算
  • 投资估算编制办法