feasibility-stage cost estimate
- 01
Estimating project investment by the production capacity index method: the formula C2 = C1 x (Q2/Q1)^X x f, variable definitions, computation order, choosing the index, and the division of use against the coefficient, ratio and indicator methods
The production capacity index method estimates C2 = C1 x (Q2/Q1)^X x f (…
T/ZBD 100.2-2022 建设项目投资估算编制作业指引 第4.1.3条DB42/T 823-2021 建设工程造价咨询质量控制规范 第5.2.2条、第6.2.3条GB/T 50875-2013 工程造价术语标准 第3.1.2条2026-10-18 - 02
Classification, compilers and roles of stage-wise investment control documents (class A13) in railway construction projects - TB 10443-2010 Section 5.13
Per TB 10443-2010 Code for Management of Railway Construction Project Re…
TB 10443-2010 铁路建设项目资料管理规程 第5.13节(投资控制资料 A13)2026-10-11 - 03
Consumption basis at the highway investment-estimation stage: "Highway Works Estimation Indicators" JTG/T 3821 (JTG 3820-2018 clause 2.1.1 labor/material/plant cost computation, clause 2.2.1 basis list)
In highway investment estimation, the labor, material/equipment and plan…
JTG 3820—2018 · Measure for Compilation of Investment Estimates of Highway Construction ProjectsJTG/T 3821 · Estimate Indicators of Highway Engineering (2018版)JTG/T 3831 · Estimate Quota of Highway Engineering2026-09-25 - 04
Cost baseline system to be locked first in the project planning (early) stage: investment estimate → target cost → design quotas → investment control decomposition statement → funds utilization plan
What is locked in the planning stage is the "overall envelope + control…
DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范DB11/T 1509-2018 公路工程设计导则铁基〔1987〕288号 铁道部关于限额设计试行办法2026-09-25 - 05
Stage positioning of highway investment estimates: an important part of the project proposal and the engineering feasibility study report (JTG 3820-2018 Clause 1.0.3), with the correspondence to estimates, budgets, and "two-stage design" and confusable points
Verbatim from Clause 1.0.3 of JTG 3820-2018 "Measures for compiling inve…
JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第1.0.3条JTG/T 3821 · Estimate Indicators of Highway EngineeringJTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects2026-09-25 - 06
Highway investment estimate — permanent equipment procurement cost at the project-proposal stage: by the Appendix C rate on the norm-based cost of works (excluding special fees and itself) (JTG 3820-2018 Clause 3.1.3)
Per Clause 3.1.3 item 1 of JTG 3820-2018 "Measures for Compiling Investm…
JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第3.1.3条JTG/T 3821—2018 · Estimate Indicators of Highway Engineering 附录一JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.3条2026-09-25