natural in-situ (undisturbed) volume
- 01
Earthwork volume conversion coefficients and spoil haul-off disposal estimation (loose / loose-fill / natural-dense / compacted conversion)
Excavation and haul are measured by the pre-excavation natural in-situ (…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明十一(一)表 4TB/T 10832-2024 · Railway works budget quota manual: Water Supply and Drainage Works, Vol. 11 (2024 series) 册说明五(一)表 1TB/T 10822-2024 · Budget Quota of Railway Engineering (Volume 1: Subgrade Works) 册说明表 22026-11-04 - 02
BOQ itemisation and measurement wording for earthworks under GB/T 50854-2024 Appendix A: item setting and codes for excavation, backfill, disposal of surplus material, borrowed-soil backfill and site levelling; the two ledgers of natural in-situ volume versus compacted volume; the balance formula; pricing splits; and the listing boundary of vertical cut-and-fill
GB/T 50854-2024 Appendix A splits earthworks into three sections: standa…
GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. A Table A.1.1(010101)、Table A.2.1(010102)、Table A.3.1(010103)及 A.4.10~A.4.13GB/T 50857-2024 · Standard for Measurement of Quantities of Municipal Works App. A Table A.3.1 回填方及余方弃置(040103)JGJ/T 498-2024《施工现场建筑垃圾减量化技术标准》第 4.0.2 条及表 22026-10-25 - 03
Beijing 2024 consumption-quota earthwork measurement basis: excavation/fill/haul by drawing volume without bulkage factors — factors used only for disposal estimation and earthwork balance
When compiling budgets under the Beijing 2024 quota (DB11/T 2382-2024)…
DB11/T 2382-2024 建设工程施工消耗量标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准JGJ/T 498-2024 施工现场建筑垃圾减量化技术标准2026-09-25 - 04
Earthwork excavation quantity take-off (measurement): working space width, slope coefficients, and haulage (disposal of surplus excavated material) quantities
Earthwork excavation quantity take-off (measurement) follows the three-l…
GB/T 50854-2024TB/T 10831-2024SJG 111.1-20222026-09-25 - 05
Rock blasting quantity take-off: by pre-blasting natural in-situ (undisturbed) volume (bank measure), and itemization linkage with GB/T 50854-2024 earthworks
Rock blasting BOQ quantities are measured in bank measure (pre-blasting…
GB/T 50862-2024 · Standard for Measurement of Quantities of Blasting Works App. A(Table A.1.1、第A.5.3条、Table A.5.3)GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. A(Table A.1.1、第A.4.10条、第A.4.14条)2026-09-25 - 06
Measurement unit for earthwork filling items: compacted volume (as-completed backfill / post-rolling volume); excavation, haul, and surplus disposal by natural in-situ (undisturbed) volume; loose volume only for loose-fill items and bulking estimates of waste haul
Filling (backfill/rolling/compaction) is measured in compacted volume: r…
TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程TB/T 10832-2024 铁路工程预算定额 Vol. 11 给水排水工程2026-09-25