norm-based labour cost
- 01
Labour cost pricing basis within the all-in unit rate: norm-based labour cost (base-period workday rate) versus current-period published labour price information and labour market prices, the applicable rules at the tender price ceiling and tender stages, and the test that the labour cost differential and the labour cost inside the all-in unit rate are not adjusted twice
Labour cost in the all-in unit rate = norm (budget) labour consumption x…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、3.1.6、3.3.5、5.2.1、5.2.4、5.2.8、6.1.1、6.1.3、6.2.1、8.6.3、8.7.1条,App. A.2.1、A.2.4GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条、App. CTB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.1.1~3.1.5条、第4.1.1~4.1.2条2026-10-25 - 02
Sources, bases and regional treatment of night-work additional cost rates: highways under JTG 3830-2018 Table 3.1.6-3 as a separate item; railways folded into the composite construction-measures rate of TB 10811-2024 Table 2.6.1 (16 works classes x regions 1-8); building and municipal works per provincial fee norms on base x rate
No unified national rate exists for night-work additional cost; the taki…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.6.1~3.6.4条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.6.1条、Table 2.6.1、App. BJTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.6条第3款、Table 3.1.6-32026-10-18 - 03
Determining overheads (company and site) and profit within the all-in unit rate: the dual track of the percentage-rate method and independent market-level measurement (including railway on-costs percentage rates)
Overheads (company and site) and profit are determined on the dual track…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第6.1.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.9.1条及Table 2.9.12026-10-18 - 04
Highway estimate/budget statutory fees (规费) base: charged on the sum of labor costs of each works class (JTG 3830-2018 clause 3.1.8) and the distinction from quota labor
Per JTG 3830-2018 clause 3.1.8, highway statutory fees comprise five ite…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.8 条(规费)JTG 3830-2018 第 3.1.2 条(人工费、综合工日单价)JTG 3830-2018 第 3.1.1 条(建安费组成、定额人工费定义)2026-09-25 - 05
Difference between norm-based labour cost and actual wages: nature, composition, basis, and adjustment mechanism
Norm-based labour cost = norm-based labour consumption × all-in labour r…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额JTG 3820-2018 公路工程建设项目投资估算编制办法2026-09-25 - 06
Publication and dynamic adjustment of the labour workday rate (all-in daily labour rate) under the 2018 highway quota system: set and published by the provincial transport authority (JTG 3830-2018, Clause 3.1.2)
Per Clause 3.1.2, item 1 of JTG 3830-2018, labour cost in highway estima…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条、第2.1.1条、第3.1.1条、第3.1.8条JTG/T 3832—2018 · Budget Quota of Highway Engineering 附录四'定额人工、材料、设备单价表'JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery2026-09-25 - 07
Composition of labor cost (quota labor cost) in the highway 2018 system: three classes of wage-type costs and the comprehensive shift-price caliber (JTG 3830-2018 Clause 3.1.2)
Per Clause 3.1.2 of JTG 3830-2018, highway estimate (budget) labor cost…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction ProjectsJTG/T 3832-2018 · Budget Quota of Highway Engineering 附录四2026-09-25