basis of preparation
- 01
Consumption basis at the highway investment-estimation stage: "Highway Works Estimation Indicators" JTG/T 3821 (JTG 3820-2018 clause 2.1.1 labor/material/plant cost computation, clause 2.2.1 basis list)
In highway investment estimation, the labor, material/equipment and plan…
JTG 3820—2018 · Measure for Compilation of Investment Estimates of Highway Construction ProjectsJTG/T 3821 · Estimate Indicators of Highway Engineering (2018版)JTG/T 3831 · Estimate Quota of Highway Engineering2026-09-25 - 02
Maximum bid price (former tender price ceiling) compilation framework and cost composition under GB/T 50500-2024
State-funded projects must set a maximum bid price (the former tender pr…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50500-2013 建设工程工程量清单计价规范招标投标法实施条例 第27条2026-09-25 - 03
Content composition of budget preparation notes and the path to automatic generation (six elements + structured field mapping)
Preparation notes have six universal elements: project overview, basis o…
DL/T 5591-2021 20kV及以下配电网工程建设预算编制导则DB42/T 823—2021 建设工程造价咨询质量控制规范DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 04
Complete list of final-account compilation materials: input basis (codes' five/ten categories + practice's ten categories), deliverable composition, and linkage with stage settlement during construction
Compiling final-account materials splits into "input basis + output deli…
GB/T 51095-2015 第8.2.2、8.2.4条GB/T 50326-2017 第18.3.3条GB/T 50500-2024 第2.0.35、10.1.4、10.3.1、10.3.4条2026-09-25 - 05
"Tender control price" and "tender price ceiling" are one and the same thing: term unification in GB/T 50500-2024 and the 2013→2024 changes in preparation requirements (basis of preparation, price sources, publication requirements, reasonable construction duration)
"Tender control price" and "tender price ceiling" are one and the same t…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.19条、第5.1.1条、第5.2.1条、第5.2.8条GB/T 50875-2013 工程造价术语标准 第3.3.1条https://zjt.jiangxi.gov.cn/jxszfhcxjst/wjtz/pc/content/content_2006185954536067072.html2026-09-25 - 06
What the "approved (validated) documents" point to in the basis of the highway revised estimate: for a revised estimate, the preliminary-design approval document (JTG 3830-2018 Clause 2.2.1 item 4)
Verbatim from Clause 2.2.1 item 4 of JTG 3830-2018 "Measures for compili…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.2节JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects2026-09-25 - 07
Appendix D “Pricing Statements” of GB/T 50500-2024: required contents of the four statement tables and dispute risks of omissions (tender price ceiling / tender (priced offer) / final account statement + method of measurement statement for the bill of quantities (BOQ))
GB/T 50500-2024 Appendix D has four statement tables: D.1.1 tender price…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works App. D(Table D.1.1/D.2.1/D.3.1/D.4.1)及第4.1.3条GB/T 51095-2015 · Code for construction cost consultation 第8.2.3条2026-09-25