Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

"Tender control price" and "tender price ceiling" are one and the same thing: term unification in GB/T 50500-2024 and the 2013→2024 changes in preparation requirements (basis of preparation, price sources, publication requirements, reasonable construction duration)

"Tender control price" and "tender price ceiling" are one and the same thing: GB/T 50500-2024 China national pricing standard for BOQ (effective 1 September 2025) uniformly renames the "tender control price" of the GB 50500 system as the "tender price ceiling" (ceiling price, Clause 2.0.19) and deletes the former term; Clause 3.3.1 of GB/T 50875-2013 had already defined the "tender control price" as "the tender price ceiling of the tendered works". Changes in preparation requirements: (1) the basis of preparation (Clause 5.2.1, eight items) no longer centres on "pricing quota norms + published construction cost information" but on "provisions on measurement of the works and pricing + project price information, construction cost data and indices", so that preparation may be based on market price information and construction cost data; (2) price sources (Clause 5.2.8) are opened up to six categories of market-based information (tender price ceilings, construction-drawing based budgets (pre-tender estimates), design estimates (approved cost ceilings) and cost estimates of similar works, competitive tender unit rates, settlement unit rates, contract prices, market price enquiry, price indices); (3) the publication requirement (Clause 5.1.1) makes it clear that the total price and the basis and method of preparation are to be published when the tender documents are issued; (4) a reasonable construction duration dimension is added (Clause 5.2.1 item 6 and the final paragraph).

Applicable Codes

  • GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.19条、第5.1.1条、第5.2.1条、第5.2.8条
  • GB/T 50875-2013 工程造价术语标准 第3.3.1条
  • https://zjt.jiangxi.gov.cn/jxszfhcxjst/wjtz/pc/content/content_2006185954536067072.html
  • https://zjt.jiangxi.gov.cn/jxszfhcxjst/wjtz/pc/content/content_1946029306944364544.html
  • http://zjt.gxzf.gov.cn/zfxxgk/fdzdgknr/wjtz/t27328889.shtml
  • https://www.yunfu.gov.cn/zjj/gsgg/zjgl/content/post_1968227.html
  • https://jst.nx.gov.cn/xwdt/zjdt/202512/t20251205_5101226.html
  • http://zjj.chifeng.gov.cn/zwgk/zfxxgk/fdzdgknr/zcwj/202404/t20240409_2299752.html

Topic Positioning

Clarifying whether the "tender control price" and the "tender price ceiling" are the same thing, tracing the unification of the name from GB 50500-2013 (China national code for BOQ pricing) to GB/T 50500-2024 (China national pricing standard for BOQ), and setting out the changes in the 2024 requirements for preparing the tender price ceiling (basis of preparation, sources of price information, publication requirements, reasonable construction duration dimension).

Core Conclusions

I. They are the same thing; the 2024 edition unifies the name.

  • GB/T 50875-2013 "Standard for construction cost terminology", Clause 3.3.1: "tender control price (Tender Sum Limit) — the tender price ceiling of the tendered works, published by the employer in accordance with the relevant pricing bases and methods issued by the state or provincial construction administrative authorities, and on the basis of the draft tender documents and the tender BOQ, in the light of the specific circumstances of the works." The definition of the "tender control price" thus itself points to the "tender price ceiling".
  • GB/T 50500-2024, Clause 2.0.19: "tender price ceiling (ceiling price) — the highest price, prepared by the employer in accordance with state laws and regulations and the relevant standards and the relevant provisions of the construction authorities, together with the draft tender documents and the tender BOQ and in the light of the actual circumstances of the works, as prescribed in this standard, that limits bidders' tenders", and it notes that the "tender price ceiling" means the highest tender price acceptable to the employer from a bidder responding to the tender requirements.
  • The 2024 edition adopts "tender price ceiling" uniformly within the GB 50500 system and deletes the term "tender control price" (GB/T 50875-2013 had already included both terms; the 2024 edition merely unified the usage within the system).

II. Changes in the 2024 requirements for preparing the tender price ceiling (verifiable in the 2024 text).

  1. Basis of preparation (Clause 5.2.1, eight items): ① this standard and the relevant national and industry standards for measurement of the works; ② the tender documents (including the tender BOQ, contract terms, tender drawings, technical standards and specifications, etc.) and their addenda, clarifications or amendments; ③ the provisions on measurement of the works and pricing issued by the state and provincial and industry construction authorities, together with the methods of measurement supplemented as required by the works; ④ the technical standards and specifications relevant to the tendered works; ⑤ the characteristics of the works and the delivery standards, the geological and hydrological data, and the site conditions; ⑥ the reasonable construction duration and conventional construction techniques and sequence; ⑦ project price information and construction cost intelligence, construction cost data and indices; ⑧ other relevant materials. The final paragraph states expressly: "the tender price ceiling may be prepared according to the actual circumstances of the works and the delivery standards and in the light of the effect of the planned construction duration on price, on the basis of market price information, construction cost data, etc." — the 2013 edition took as its framework the "pricing quota norms and pricing methods issued by the state or provincial industry construction authorities + the construction cost information published by the construction cost management authorities"; the 2024 edition no longer lists quota norms and published price information (government guidance prices) as mandatory bases, and instead uses the framework "relevant provisions on measurement of the works and pricing + price information and construction cost data", expressly permitting preparation from market price information.
  2. Sources of price information (Clause 5.2.8, six categories): ① prices of recently completed similar works' tender price ceilings, construction-drawing based budgets (pre-tender estimates), design estimates (approved cost ceilings) and cost estimates; ② recently obtained reasonable competitive tender unit rates for similar works; ③ recently determined settlement unit rates for similar billed (BOQ) items; ④ recently signed contract prices for similar works; ⑤ reasonable construction prices (labour, materials, construction plant and machinery, all-in unit rates for billed (BOQ) items, etc.) obtained through market price enquiry; ⑥ recent market prices for labour, materials and construction plant and machinery, and the relevant price indices or tender price indices, etc. In other words, from the single track of published price information (government guidance prices) to multi-source market-based pricing: similar-works prices + market competitive prices + settlement prices + contract prices + market price enquiry + price indices.
  3. Who prepares it and the publication requirement (Clause 5.1.1): where a tender price ceiling is set for a tender, it shall be prepared in accordance with the relevant state provisions, and the total tender price ceiling together with the basis and method of preparation shall be published when the tender documents are issued; it shall be prepared by a capable employer or by a construction cost consultant commissioned by it, in accordance with this standard and the relevant provisions such as the national and industry standards for measurement of the works.
  4. New reasonable construction duration dimension: item 6 of Clause 5.2.1 requires consideration of the "reasonable construction duration and conventional construction techniques and sequence", and the final paragraph requires preparation "in the light of the effect of the planned construction duration on price" — the effect of duration on price is expressly brought into the preparation of the ceiling.

Applicable Boundaries

  • The core conclusions of this card are based on Clauses 2.0.19, 5.1.1, 5.2.1 and 5.2.8 of GB/T 50500-2024 (effective 1 September 2025) and the terminology definition in Clause 3.3.1 of GB/T 50875-2013; the above clauses may be quoted verbatim.
  • The specific clauses of the 2013 edition (e.g. Clause 5.1.1 of the mandatory provisions of codes, "BOQ-based pricing must be used", and Clause 5.2.1, basis of preparation) are not covered by this card's evidence base; the text gives only the general industry account of "quota norms + published price information (government guidance prices) as the framework"; before quoting the 2013 wording verbatim it must be verified against a copy of the 2013 text.
  • GB/T 50500-2024 is a recommended national standard (GB/T), whereas GB 50500-2013 was a mandatory code (GB); the two are different in the nature of their provisions; where the basis of pricing applicable to state-funded projects is concerned, the local implementing rules issued by the provincial housing and construction authorities must also be checked (see the local official documents referred to under Further Reading).

Further Reading

Keywords

Cited By