percentage-rate based pricing
- 01
Content and pricing methods of preliminaries: the 2024 definition (clause 2.0.3), the listing basis (GB/T 50854-2024 annex R table R.1.1 preliminary items, code 011601), the three pricing methods of unit rate / lump sum / percentage rate and their preferred use (clauses 2.0.10 to 2.0.12, 3.2.1), the completion rules of annex E tables E.3.1 to E.3.4, and the non-competitive rule for statutory safety provisions (clause 3.2.5)
Preliminaries are 'project costs incurred in taking the relevant measure…
GB/T 50500-2024 第 2.0.3 条(措施项目术语)GB/T 50500-2024 第 2.0.10~2.0.12 条(单价计价/总价计价/费率计价)GB/T 50500-2024 第 3.2.1 条(措施项目清单计价方式)2026-11-01 - 02
Whether rate-priced mandatory HSE provisions (statutory safety provisions) adjust at settlement: three adjustment doors (quantity-linked base, legal and policy change, major variation or raised standards), the rate-lump-sum principle regardless of actual spend, and the settlement base plus the 2013/2024 edition gap
Mandatory HSE provisions (railway: work safety funds; GB/T 50500-2024: s…
GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第3.1.5、9.3.2、9.6.2、9.6.3、11.2.3条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.2.5、7.3.1、8.2.2、8.8.1~8.8.5、8.9.6、8.10.4、10.3.3条建办〔2005〕89号《建筑工程安全防护、文明施工措施费及使用管理规定》2026-10-25 - 03
The unit-price / total-price preliminaries divide and its migration in the BOQ system: the 2013 'unit-price items / total-price items' split of GB 50500-2013 clauses 4.3.1-4.3.2 against the three pricing methods of GB/T 50500-2024 clauses 2.0.10~2.0.12 and 3.2.1
GB 50500-2013 clause 4.3.2 split preliminaries by 'whether quantities ca…
GB/T 50500-2024 第2.0.10条、第2.0.11条、第2.0.12条GB/T 50500-2024 第3.1.5条GB/T 50500-2024 第3.2.1条2026-10-25 - 04
GB/T 50500-2024: definitions of the three pricing methods (unit rate / lump sum / rate-based) and their applicability to each BOQ category
GB/T 50500-2024 provides: work-section BOQ items and day-work items shou…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.10~2.0.12、3.1.5、3.2.1、3.2.7条2026-09-25 - 05
Bill of preliminaries classification basis difference between GB/T 50500-2024 and GB 50500-2013: two-way split by measurability vs three pricing methods (unit-rate/lump-sum/percentage-rate)
GB 50500-2013 split preliminary items by 'whether quantities can be comp…
GB 50500-2013 建设工程工程量清单计价规范 第4.3.2、6.2.3、6.2.4条GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.10~2.0.12、3.1.5、3.2.1条及App. ETable E.3.22026-09-25 - 06
GB/T 50500-2024 pricing and settlement adjustment of main contractor's attendance and coordination provisions: per-item risk-inclusive pricing, percentage-rate based adjustment, interim settlement by construction stage, and recomputation at final account
Where the fee is priced per item, it is risk-inclusive except for deduct…
GB/T 50500-2024 第2.0.17、3.2.9、4.2.6、6.2.9、8.4.8、8.5.1~8.5.5、10.2.6、10.3.3条2026-09-25