interior scaffolding
- 01
Judging double counting between masonry scaffolds and finishing scaffolds: exclusivity between the comprehensive and individual scaffold bases, position exclusivity (birdcage scaffold versus wall finish scaffold), the 3.60m height boundary, and one quota line item only where masonry, plastering and coating on the same wall share one scaffold
Non-duplication is judged on four exclusivity lines only: (1) basis excl…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明四、五、六GB/T 50860-2024 · Standard for Measurement of Quantities of Structures Works 第4.3.3条GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. R2026-10-25 - 02
Choosing the measurement basis for scaffold costs in tender rate build-up for building works (frame-structure office building): comprehensive scaffold by gross floor area versus individually priced scaffolds by vertical projected area / net room area, double-row external scaffold triggers, interior scaffolds and birdcage scaffold for ceilings
Building works whose gross floor area can be computed (including multi-s…
TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(册说明四、五、六)GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. R 措施项目湖南2025版房屋建筑与装饰工程消耗量标准 第十八章 脚手架工程2026-10-18 - 03
Applicability relationship between comprehensive scaffolding and individual scaffolding and their quantity calculation rules (railway buildings quota TB/T 10831-2024)
Comprehensive scaffolding and individually priced scaffolds must not be…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明四、五、六TB/T 10831-2024 Ch. 1土建工程第四节 脚手架工程(FY-415~FY-442)湖南 2025 版《房屋建筑与装饰工程消耗量标准》第十八章 脚手架工程2026-10-18 - 04
The height boundary, quantity bases and base-layer / additional-layer computation of interior scaffolding and birdcage scaffolds (TB/T 10831-2024 and the Shaanxi, Hunan, Jiangsu and other local quota differences)
Interior scaffolding measures on vertical wall projection without deduct…
TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程SJG 111.2-2022 城市地下综合管廊工程消耗量标准(Vol. 2 管廊建筑与装饰工程)陕西省2024消耗量定额(征求意见稿)2026-10-14 - 05
Rules for pricing fencing (wall) and finishing works scaffolding by applying quota line items: the 3.60 m threshold, interior finish / birdcage (full-area) / cradle classification, and regional system differences (railway / Hunan / Jiangsu / Beijing)
Fencing (wall) scaffolding is banded by masonry height: ≤3.60 m by inter…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works)湖南2025版《房屋建筑与装饰工程消耗量标准》江苏2026版《建筑与装饰工程消耗量标准》2026-09-25 - 06
Does comprehensive scaffolding include interior and birdcage (full-area) scaffolds: what comprehensive covers (masonry/finishing within 3.6 m), birdcage (full-area) scaffolding above 3.6 m, and anti-duplication rules (Hunan/Shaanxi/Jiangsu/railway calibers)
The relation is not simple inclusion: interior and birdcage (full-area)…
TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works)湖南2025《房屋建筑与装饰工程消耗量标准》第十八章 脚手架工程陕西新编消耗量定额(征求意见稿)脚手架部分2026-09-25