Documentation formation and archiving after acceptance of dangerous sub-part works: acceptance record sheets, dual-signature confirmation, acceptance sign plates, and contractor/supervisor archive composition
After a dangerous sub-part work passes acceptance, the next process may be entered only after dual-signature confirmation by the contractor's project technical responsible person and the chief supervision engineer, with an acceptance sign plate erected at a prominent on-site location publicizing the acceptance time and responsible persons (MOHURD Order No. 37, Article 21); a special acceptance record sheet is formed on the spot (referring to the Table D.0.5 series of T/HAEC 003-2020), and afterwards the acceptance records, special inspections, rectification records, etc. are archived into the contractor's dangerous-sub-part-works archive, while supervision simultaneously retains the acceptance records and rectification materials into the dangerous-sub-part-works supervision archive (DB37/T 5009-2022, T/GDPAWS 12-2022).
Applicable Codes
- 住建部令第37号(47号修正)第二十一条
- 建办质〔2018〕31号
- T HAEC 003-2020
- DB22/T 5115-2022
- DB37/T 5009-2022
- T GDPAWS 12-2022
- DBJ41/T 228-2019
Topic Positioning
This card sorts out the materials to be formed and archived after a dangerous sub-part work passes acceptance — on-the-spot records, dual signatures, on-site publicity, and the archive composition on both the contractor and supervision sides; it is the closing link of the closed-loop management of dangerous sub-part works.
Core Conclusions
Per MOHURD Order No. 37 (as amended by Order No. 47) Article 21: (1) after passing acceptance, the next process may be entered only with the signatures of the contractor's project technical responsible person and the chief supervision engineer; (2) an acceptance sign plate is set at a prominent on-site location, publicizing the acceptance time and responsible persons; (3) a special acceptance record sheet is formed on the spot, the form referring to the Table D.0.5 series of Appendix D of T/HAEC 003-2020; (4) the contractor's dangerous-sub-part-works archive covers the full chain of the special scheme and its review, expert demonstration, disclosure, on-site inspection, acceptance, and rectification records (DB22/T 5115-2022 Section 5.15); (5) the supervision archive contains the supervision implementation rules, scheme review results, special patrol inspection records, acceptance and rectification materials, third-party monitoring reports, safety-technical disclosure materials, etc. (DB37/T 5009-2022, T/GDPAWS 12-2022).
Applicable Boundaries
Applies to the acceptance and archiving links of dangerous sub-part works in building and municipal infrastructure works; form numbers, copies, and archive details vary with regional standards (Jilin DB22/T 5115-2022, Henan DBJ41/T 228-2019, Shandong DB37/T 5009-2022) — the current standards at the project location govern; acceptance personnel composition and the expert demonstration procedure are in the related cited cards.
Further Reading
MOHURD Order No. 37 (as amended by Order No. 47) Article 21; Jianban Zhi [2018] No. 31 Article 3; T/HAEC 003-2020 Section 10.29 and Appendix D Tables D.0.1-D.0.5; DB22/T 5115-2022 Clauses 5.15.4-5.15.6; DB37/T 5009-2022 Clause 9.4.4; T/GDPAWS 12-2022 Appendix B.0.4; DBJ41/T 228-2019 Clause 7.1.9.