Management of sub-divisional works involving significant hazards - overview: scope determination, dedicated method statement with dual-signature approval, expert review, implementation, monitoring and acceptance, three-party liabilities (MOHURD Order No. 37 framework)
The hazardous-works chain: scope per MOHURD Order No. 37 plus the Jian Ban Zhi [2018] No. 31 lists, with expert panel review beyond the scale line; the dedicated scheme is compiled before construction (organised by the main contractor; a specialist subcontractor may compile), with safety calculations attached; dual sign-off gives it effect (art. 11): the contractor's technical director plus the chief supervising engineer. The panel: at least five experts from the local authority's panel, interested persons excluded, tri-state conclusion (arts. 12-13). Implementation: two-stage briefing plus the safety-condition check; the supervisor compiles a dedicated plan and patrols, reporting to the housing authority if the contractor refuses to rectify (arts. 18-19); after acceptance passes and the project technical leader and chief supervising engineer sign, the next process may begin (art. 21). Supervisory defaults draw an order to correct plus RMB 10,000-30,000, and RMB 1,000-5,000 on the responsible person (art. 37).
An entry card for the domain of sub-divisional works involving significant hazards ("wei-da gongcheng"): it strings toge…