Statutory duties and legal consequences of the project responsible person during construction of dangerous sub-part works
During construction of dangerous sub-part works, the project responsible person is the first person responsible for work safety; the statutory duties are "on-site presence + immediate rectification upon report + immediate evacuation in emergencies + hazards recorded in the archive + 80% on-site leading time": perform duties on site and organize worker registration; upon the full-time safety officer's report, organize time-limited rectification in time; upon emergency situations endangering personal safety, organize immediate evacuation; monitor dangerous sub-part works, screen hazards into the safety archive; the general contractor regularly assesses subcontractors; on-site leading of no less than 80% of each month's construction time (on-site leading is mandatory during construction of dangerous sub-part works). Failure to perform duties or failure to organize time-limited rectification: fine of 10,000-30,000 CNY; directly responsible persons fined 1,000-5,000 CNY.
Applicable Codes
- 住房和城乡建设部令第37号(2019年47号令修正)危险性较大的分部分项工程安全管理规定
- 住房和城乡建设部令第17号 建筑施工企业主要负责人、项目负责人和专职安全生产管理人员安全生产管理规定
- 建质〔2011〕111号 建筑施工企业负责人及项目负责人施工现场带班暂行办法
- 建质〔2014〕123号 建筑施工项目经理质量安全责任十项规定(试行)
Topic Positioning
The statutory duties of the project responsible person during construction of dangerous sub-part works and the legal consequences of violations, per MOHURD Order No. 37 (as amended by Order No. 47 of 2019) and MOHURD Order No. 17.
Core Conclusions
The project responsible person is the first person responsible for work safety of dangerous sub-part works; the duties are summarized as "on-site presence + immediate rectification upon report + immediate evacuation in emergencies + hazards into the archive + 80% leading time": (1) Perform duties on the construction site and organize the registration of workers on dangerous sub-part works; (2) upon the full-time safety officer's report of construction not per the scheme, organize time-limited rectification in time; (3) organize construction monitoring and safety patrols, and organize immediate evacuation of workers upon emergency situations endangering personal safety; (4) monitor dangerous sub-part works, screen accident hazards and record them in the safety-management archive, report accidents in time and carry out on-site rescue; (5) the general contractor's project responsible person regularly assesses the work-safety management of subcontractors; (6) on-site leading of no less than 80% of the month's construction time; leaving the site requires leave from the employer; during construction of dangerous sub-part works such as erection and removal of lifting machinery and erection of formwork supports, on-site leading is mandatory. Legal consequences: failure to perform duties on site or failure to organize time-limited rectification — order correction within a time limit and a fine of 10,000-30,000 CNY; directly responsible persons fined 1,000-5,000 CNY.
Applicable Boundaries
Applies to building and municipal infrastructure works. When dangerous sub-part works are subcontracted, scheme sign-off responsibility has separate provisions (joint check-and-sign by the technical responsible persons of both the general contractor and the subcontractor); provincial detailed rules may tighten requirements (e.g., special inspections no fewer than 2 per month during construction of exceeding-scale dangerous sub-part works) — the detailed rules at the project location govern.
Further Reading
MOHURD Order No. 37 (as amended by Order No. 47) Articles 17, 35; MOHURD Order No. 17 Article 18; Jianzhi [2011] No. 111 and Jianzhi [2014] No. 123; T/XCIA 3-2023 Clause 3.2.2; formats of on-site-leading records and other process documents may refer to DBJ41/T 228-2019 Tables 14 and 15.
Keywords
- sub-divisional works involving significant hazards
- 项目负责人
- 法定职责
- 施工现场履职
- 现场带班
- 组织限期整改
- 第一责任人