Which works require a separately prepared dedicated method statement for high-risk works: a layered determination framework covering statutory compulsion for sub-divisional works involving significant hazards + expert panel review for scale-exceeding works + code requirements for main divisional (sub-divisional) works
The obligation to prepare dedicated method statements for high-risk works is determined in three layers: (1) sub-divisional works involving significant hazards (the eight categories of Appendix 1 of Jianban Zhi [2018] No. 31: excavation >= 3 m, formwork supports with height >= 5 m or span >= 10 m or total load >= 10 kN/sqm or line load >= 15 kN/m, ground-standing scaffolding >= 24 m, non-conventional lifting >= 10 kN, undercutting, demolition and blasting, etc.) must have a dedicated method statement prepared separately before construction; (2) works reaching the scale-exceeding thresholds (Appendix 2) additionally require expert panel review; (3) ordinary works: for unit works, construction method statements shall be prepared for main divisional (sub-divisional) works per GB/T 50502-2009 Clause 5.5.1, approved by the project technical responsible person.
Applicable Codes
- 《危险性较大的分部分项工程安全管理规定》住建部令第37号(47号令修正)
- 建办质〔2018〕31号附件1、附件2
- GB/T 50502-2009 建筑施工组织设计规范
- GB 50300 建筑工程施工质量验收统一标准
Topic Positioning
Addresses "which works require a separately prepared dedicated method statement for high-risk works": it provides the layered determination framework of sub-divisional works involving significant hazards (statutory compulsion) -> scale-exceeding works (expert panel review) -> ordinary main divisional (sub-divisional) works (code requirement), for checking the method-statement preparation list at the construction-preparation stage.
Core Conclusions
The method-statement preparation obligation has three layers: (1) sub-divisional works involving significant hazards — statutory compulsion: any work falling within the scope of Appendix 1 of Jianban Zhi [2018] No. 31 (excavation depth >= 3 m or complex geological and environmental conditions; formwork supports with erection height >= 5 m, or span >= 10 m, or total construction load >= 10 kN/sqm, or concentrated line load >= 15 kN/m; ground-standing steel-tube scaffolding >= 24 m; non-conventional lifting of a single piece >= 10 kN; mining-method/shield/pipe-jacking undercutting; demolition and blasting; tool-type formwork; prefabricated component installation, etc. — eight categories) must have a dedicated method statement for high-risk works prepared separately before construction and go through review and approval; (2) works exceeding a certain scale (Appendix 2: deep excavation >= 5 m, formwork supports with height >= 8 m or span >= 18 m or total load >= 15 kN/sqm, ground-standing scaffolding >= 50 m, etc.) — the dedicated method statement must additionally undergo expert panel review; (3) ordinary works: unit works shall, per the GB 50300 principles for dividing divisional (sub-divisional) works, prepare construction method statements for main divisional (sub-divisional) works (GB/T 50502-2009 Clause 5.5.1), approved by the project technical responsible person, at a depth lower than that of the dedicated method statements for sub-divisional works involving significant hazards.
Applicable Boundaries
Applies to building and municipal infrastructure works; the scope of sub-divisional works involving significant hazards must be verified by superimposing the "national list + local detailed rules" (provincial housing and construction departments may only tighten and expand, never narrow); the loads in the determination all refer to design values (fundamental combination of load effects); this card answers only "what must be prepared" — the method-statement content framework (9 items), the sign-off responsibility chain, and the expert panel review procedure are covered in the related dedicated cards.
Further Reading
MOHURD Order No. 37 (as amended by Order No. 47) Articles 3, 12; Appendices 1 and 2 of Jianban Zhi [2018] No. 31; GB/T 50502-2009 Clauses 3.0.1, 5.5.1; GB 50300 principles for dividing divisional (sub-divisional) works; local refinements: DB22/JT 127-2017 Clause 6.2.2, DBJ04/T 253-2021 Appendix B, T/XCIA 3-2023 Clauses 3.3.2-3.3.3.
Keywords
- dedicated method statement for high-risk works
- sub-divisional works involving significant hazards
- 超过一定规模危大工程
- expert panel review
- 施工方案编制
- 主要分部分项工程
- 建办质2018-31号
- GB50502