Project execution plan and construction method statements - life-cycle overview: classification, preparation, approval, implementation, dynamic management and changes
Execution plans divide into three tiers by object (overall project execution plan / unit-works execution plan / method statement), each compiled under the project manager's leadership, framed on the eight basic contents and approved by tier (the contracting enterprise's technical director / the contractor's technical director / the project technical director). High-risk dedicated schemes need the dual sign-off of the contractor's technical director plus the chief supervising engineer, and beyond a stated scale an expert panel of at least five, with the tri-state conclusion pass / pass after revision / fail. Before implementation: tiered briefing, supervisory review and signature, dedicated patrol inspection; five statutory triggers (major design modification, legal and standards change, major changes of method or resources, major change of environment) require revision and re-approval in principle at the original level (GB 55032-2022 cl. 3.1.4, mandatory: changes follow the original approval procedure); a materially changed high-risk scheme must be recompiled and re-reviewed by the panel, and after an adjusted scheme passes approval it is briefed again.
An entry card for the domain of the project execution plan (shigong zuzhi sheji) and construction method statements,