GB/T 50500-2024 replacing GB 50500-2013: what GB becoming GB/T means, expiry of the 2013 mandatory provisions, and the 2025-09-01 effective date
MOHURD Announcement (No. 212 of 2024, issued 2024-11-26) approved the "Standard for measure and valuation of construction work with bills of quantities" as national standard GB/T 50500-2024, effective 1 September 2025, repealing GB 50500-2013 simultaneously. GB = mandatory national standard, GB/T = recommended (Standardization Law, 2017 revision, Article 2: mandatory standards must be executed; adoption of recommended standards is encouraged); all 2013 mandatory provisions expire with the standard, and the 2024 edition sets no mandatory provisions. Typical contrast: 2013 Clause 3.1.1 (mandatory) "works contracted with state-owned funds must use BOQ pricing" becomes 2024 3.1.1 with fiscal/state-funded works "shall" and others "should" use BOQ pricing. The binding force of a recommended standard is realized through incorporation in tender documents and contracts.
Applicable Codes
- GB/T 50500-2024 建设工程工程量清单计价标准(住建部公告 2024 年第 212 号,2025-09-01 实施)
- GB 50500-2013 建设工程工程量清单计价规范(已废止)
- 中华人民共和国标准化法(2017 修订,主席令第 78 号)第二条
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(住建部公告 2024 年第 191 号)
- GB/T 50860-2024 构筑物工程工程量计算标准(废止 GB 50860-2013)
Topic Positioning
This card covers GB/T 50500-2024 replacing GB 50500-2013: the legal meaning of GB -> GB/T (mandatory -> recommended), whether the 2013 mandatory provisions survive, the 3.1.1 wording comparison, the effective date, and the synchronized replacement of the companion measurement standards.
Core Conclusions
- Effect and repeal: MOHURD Announcement (No. 212 of 2024, issued 26 Nov 2024) approved the standard as GB/T 50500-2024, effective 1 September 2025; GB 50500-2013 is repealed simultaneously.
- GB vs GB/T: GB is a mandatory national standard, GB/T recommended. Per the Standardization Law (2017 revision, Decree No. 78) Article 2: "National standards are divided into mandatory and recommended... mandatory standards must be executed. The state encourages adoption of recommended standards." GB/T 50500-2024 is thus recommendatory, carrying no inherent legal compulsion; its force mainly arises through tender documents and contracts incorporating it as contractual obligations.
- Fate of the 2013 mandatory provisions: with GB 50500-2013 repealed wholesale, all its mandatory (bold-type) provisions lose force, and the 2024 text sets none. Typical contrast - 2013 Clause 3.1.1 (mandatory): "Works contracted with state-owned funds must use BOQ pricing", where state-owned funds include fiscal budget funds at all levels, government special construction funds under fiscal management, and self-owned funds of state-owned enterprises/institutions where state investors actually control; state financing includes bonds, foreign borrowing or guarantees, policy loans, financing by state-authorized investors, and state-franchised financing; "predominantly state-owned" means 50%+ of total investment, or under 50% but with state investors holding substantive control. 2024 Clause 3.1.1: "Works invested with fiscal or state-owned funds shall prepare BOQs per national and industry measurement standards and use BOQ pricing; works not so invested should..." ("shall/should" are requirement wording within a recommended standard, itself without legal compulsion.)
- Companion measurement standards: the measurement-standard series effective the same day (1 Sep 2025) likewise changed from GB to GB/T, repealing their 2013 editions - e.g., GB/T 50854-2024 (housing and decoration works measurement, Announcement No. 191 of 2024) repeals GB 50854-2013; GB/T 50860-2024 (structures works) repeals GB 50860-2013 (whose Clause 1.0.3 was also mandatory: "pricing of structures works must measure per this code's rules").
Applicable Boundaries
- Answers "nature and force of the standard" only; specific 2024 pricing-rule changes (pre-tax full-cost unit rates, ceiling prices, 5% adjustment floor, in-process settlement) are in cited cards.
- Recommended does not mean "may be ignored": once tender documents or the contract state execution of GB/T 50500-2024, its content becomes contractual duty; requirements with separate legal bases (e.g., bidding rules on ceiling prices) are unaffected by the downgrade.
- The effective date is 1 September 2025 per the announcement - do not confuse it with companion-standard announcement dates; from that day the 2013 provisions are no longer current.
- Positioning: 2024 Clause 1.0.7 - pricing activities in tendering, contracting, and implementation shall also comply with current relevant standards.
Further Reading
- Announcement text: MOHURD "Announcement on publishing the national standard 'Standard for measure and valuation of construction work with bills of quantities'" (No. 212 of 2024, 26 Nov 2024), public at www.mohurd.gov.cn.
- Legal basis: Standardization Law (2017 revision, Decree No. 78) Article 2.
- Clause comparison: 2013 3.1.1 (mandatory) vs 2024 3.1.1; 2013 4.1.2 (tender BOQ must form part of tender documents) vs 2024 3.1.8 (liability split by unit-price/lump-sum contract) - see cited cards; companion-standard comparison in the GB/T 50854-2024 card.