time-related overheads during suspension
- 01
Suspension of the works in four categories (employer-caused / contractor-caused / force majeure / government-ordered suspension): comparison of cost treatment - entitlement rules for personnel wages, time-related overheads during suspension, idle plant costs and suspension profit, extension of time and evidentiary requirements (clause-level comparison)
Suspension is classified by responsible party into three categories, wit…
GB/T 51262-2017 · Code for Construction Cost Appraisal 第5.7.4条、第5.8.3条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11.3条、第8.11.9条、第8.11.10条、第8.11.12~8.11.15条T/YJXB 0001-2023《建设工程停工承包人费用计算标准》第1.0.3、2.0.6、3.0.9、4.0.3、4.0.5、4.0.8、4.0.12、5.0.3、5.0.8、5.0.9、5.0.12、6.0.3、6.0.5、6.0.8、6.0.9条2026-11-08 - 02
Whether wages of site management personnel and time-related overheads during suspension can be included in an idle-cost claim: determining recoverable and non-recoverable scenarios, the calculation basis and the procedural limits
Yes, but only when handled as two separate cost heads passing three gate…
GB/T 51262-2017 · Code for Construction Cost Appraisal 第5.8.3条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11.3、8.11.9、8.11.10、8.11.12、8.11.13条T/YJXB 0001-2023《建设工程停工承包人费用计算标准》第2.0.7、3.0.9、4.0.5、4.0.8、5.0.8条2026-10-29 - 03
Computing and compensating suspension and idle-resource losses caused by the employer: idle labour costs, plant standby costs (hired vs owned plant), suspension overheads and suspension profit
Where the employer causes the suspension, the employer bears the costs (…
GB/T 51262-2017 · Code for Construction Cost Appraisal 第5.8.3条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11.9条、第8.11.10条T/YJXB 0001-2023《建设工程停工承包人费用计算标准》第5.0.3条、第5.0.5条、第5.0.8条、第5.0.9条2026-10-11 - 04
Work suspension caused by suppliers' delayed delivery: the contractor's loss composition, calculation methods, and legal boundaries (T/YJXB 0001-2023)
A supplier's delayed delivery is a breach of the sales contract; suspens…
T/YJXB 0001-2023 建设工程停工承包人费用计算标准GB/T 50500-2024 建设工程工程量清单计价标准中华人民共和国民法典 第584、591条2026-09-25 - 05
Suspension caused by the employer: claim basis and accrual limits for on-site management staff wages (suspension management fee)
Where construction is suspended for employer causes, on-site management…
GB/T 51262-2017 建设工程造价鉴定规范GB/T 50500-2024 建设工程工程量清单计价标准T/YJXB 0001-2023 建设工程停工承包人费用计算标准2026-09-25 - 06
Panorama of suspension cost items for non-contractor-caused stoppages (T/YJXB 0001-2023: protection / standstill / wages / management / profit / demobilization / price rises / statutory fees)
For non-contractor-caused stoppages, the contractor may claim suspension…
T/YJXB 0001-2023 第2.0.1、4.0.1~4.0.22条GB/T 51262-2017 第5.8.3条GB/T 50500-2024 第8.11.9、8.11.12条2026-09-25 - 07
Settlement during suspension: completed qualified work settled as normal + suspension costs shared by cause (employer/contractor/force majeure)
Suspension settlement splits into two ledgers: qualified completed work…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51262-2017 建设工程造价鉴定规范T/YJXB 0001-2023 建设工程停工承包人费用计算标准2026-09-25