fully loaded all-in rate (incl. taxes and specified on-costs)
- 01
Cost items expressly excluded from the all-in unit rate in BOQ-based pricing (VAT, statutory levies and fees, main contractor's attendance and coordination provisions, provisional sums, employer-borne costs, statutory safety provisions), the correct billing position of each, and audit identification of mixed allocation
Under GB/T 50500-2024 Clause 2.0.9 the all-in unit rate 'includes labour…
GB/T 50500-2024 第 2.0.9、2.0.13、2.0.17 条GB/T 50500-2024 第 3.1.6、3.2.2、3.2.4、3.2.5、3.2.9、3.2.11、3.6.1、3.7.4 条GB/T 50500-2024 第 4.2.6 条、第 6.2.4 条、第 8.3.1 条、App. E Table E.4.5、App. G.1 Table G.1.12026-10-25 - 02
Layered build-up of the fully loaded all-in rate: the base chain from labour, materials and plant through overheads, profit, statutory levies and taxes; the three charging-base regimes; why percentage rates cannot be added directly; and the cost boundary and conversion against the BOQ all-in unit rate (which excludes statutory levies as a separate line and VAT)
The fully loaded all-in rate must be built up layer by layer: overheads…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.9、3.1.2、3.1.6、3.2.11条GB/T 51095-2015 · Code for construction cost consultation 第5.3.9、6.2.3条及App. CJTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.8、3.1.9、3.1.10条2026-10-25 - 03
Whether the all-in unit rate includes statutory levies and taxes: comparison and determination between BOQ-based pricing (non-fully-loaded) and the fully loaded all-in rate
Whether the all-in unit rate includes statutory levies and taxes depends…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准GB/T 51095-2015 建设工程造价咨询规范2026-10-01 - 04
Definitions, cost composition and applicable conventions of the direct-cost rate, the all-in unit rate and the fully loaded all-in rate compared (Order No. 107 of the Ministry of Construction, GB/T 50500-2024, GB/T 51095-2015, etc.)
The three rate conventions widen in scope in turn: the direct-cost rate…
《建筑工程施工发包与承包计价管理办法》(建设部令第107号)第五条《建筑工程施工发包与承包计价管理办法》(住房和城乡建设部令第16号,2014年施行;建设部令第107号的现行替代版本)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.9条、第3.1.6条、第3.1.7条2026-09-25 - 05
Distinguishing the basis of the all-in unit rate from that of the fully loaded all-in rate (incl. taxes and specified on-costs): composition differences, applicable scenarios, and risks of mixed use
Narrow-sense all-in unit rate = labour cost + material cost (including e…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准2026-09-25 - 06
A six-dimension framework for unifying cost-data calibers across projects (cost composition / quantities / tax / time / allocation / tagging)
Caliber unification = fixing one set of "comparable benchmarks" across s…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51290-2018 建设工程造价指标指数分类与测算标准2026-09-25 - 07
Definition and cost composition of the all-in unit rate (GB/T 50500-2024 Clause 2.0.9, GB/T 50875-2013 Clause 2.2.58)
All-in unit rate = labour cost + material cost (including engineering eq…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条GB/T 50875-2013 工程造价术语标准 第2.2.58条2026-09-25