lump-sum pricing
- 01
Content and pricing methods of preliminaries: the 2024 definition (clause 2.0.3), the listing basis (GB/T 50854-2024 annex R table R.1.1 preliminary items, code 011601), the three pricing methods of unit rate / lump sum / percentage rate and their preferred use (clauses 2.0.10 to 2.0.12, 3.2.1), the completion rules of annex E tables E.3.1 to E.3.4, and the non-competitive rule for statutory safety provisions (clause 3.2.5)
Preliminaries are 'project costs incurred in taking the relevant measure…
GB/T 50500-2024 第 2.0.3 条(措施项目术语)GB/T 50500-2024 第 2.0.10~2.0.12 条(单价计价/总价计价/费率计价)GB/T 50500-2024 第 3.2.1 条(措施项目清单计价方式)2026-11-01 - 02
Definition, BOQ item (011601002) and cost composition of vertical transport: the pricing vehicle for machine-shifts of large vertical handling plant and their attending labour; a preliminaries item priced as a lump sum per item and held fixed; and its boundary against the plant costs of work items (concrete pumping, extra height for concrete placing)
Vertical transport cost is the price of BOQ item 011601002 'vertical tra…
GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. R(Table R.1.1 措施项目,编码 011601;R.2.3 垂直运输)GB/T 50860-2024 · Standard for Measurement of Quantities of Structures Works App. C(C.2.3 垂直运输)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.2.1、3.2.6、3.3.7、4.2.5、6.2.6、7.3.1 条,App. E Table E.3.22026-11-01 - 03
The unit-price / total-price preliminaries divide and its migration in the BOQ system: the 2013 'unit-price items / total-price items' split of GB 50500-2013 clauses 4.3.1-4.3.2 against the three pricing methods of GB/T 50500-2024 clauses 2.0.10~2.0.12 and 3.2.1
GB 50500-2013 clause 4.3.2 split preliminaries by 'whether quantities ca…
GB/T 50500-2024 第2.0.10条、第2.0.11条、第2.0.12条GB/T 50500-2024 第3.1.5条GB/T 50500-2024 第3.2.1条2026-10-25 - 04
The dividing line between unit-rate and lump-sum preliminaries in the bill of preliminaries: the 'whether quantities can be computed' binary test of GB 50500-2013 section 4.3, and how it is landed as itemisation and coding in GB 50854-2013 Annex S and GB/T 50854-2024 Annex R
The commentary to GB 50500-2013 clause 4.3.2 takes 'whether quantities c…
GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第 4.3.1 条(强制性条文)、第 4.3.2 条及条文说明GB 50854-2013 · Code for Measurement of Quantities of Building and Decoration Works 第 4.2.7 条、第 4.3.1 条(强制性条文)、第 4.3.2 条、App. S Table S.1/S.2/S.3/S.5/S.6/S.7GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第 4.3.1 条、App. R Table R.1.1(011601)、R.2.2、R.2.3、App. E Table E.5.1(010505)2026-10-25 - 05
GB/T 50500-2024: definitions of the three pricing methods (unit rate / lump sum / rate-based) and their applicability to each BOQ category
GB/T 50500-2024 provides: work-section BOQ items and day-work items shou…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.10~2.0.12、3.1.5、3.2.1、3.2.7条2026-09-25 - 06
Pricing rules for prime-sum estimates (provisional sums) of specialist works: GB/T 50500-2024 VAT-inclusive, lump-sum per item, deduction from the VAT base, and substitution on adjustment (compared with GB 50500-2013)
GB/T 50500-2024 defines the prime-sum estimate of specialist works as "s…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works (第2.0.15、3.1.6、3.2.7、3.2.11、8.4.1、8.4.7条)GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works (第4.4、5.2.5、9.9节,已废止)住房城乡建设部公告2024年第212号2026-09-25 - 07
Bill of preliminaries classification basis difference between GB/T 50500-2024 and GB 50500-2013: two-way split by measurability vs three pricing methods (unit-rate/lump-sum/percentage-rate)
GB 50500-2013 split preliminary items by 'whether quantities can be comp…
GB 50500-2013 建设工程工程量清单计价规范 第4.3.2、6.2.3、6.2.4条GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.10~2.0.12、3.1.5、3.2.1条及App. ETable E.3.22026-09-25