Monthly project cost analysis template: mandatory elements per the codes, section structure, and the three-cost comparison workflow
A monthly cost analysis report has three mandatory elements: completion…
GB/T 50326-2017 建设工程项目管理规范RISN-TG 012-2011 建设工程项目经理执业导则GB/T 50502-2009 建筑施工组织设计规范2026-09-25 - 02
A pipeline for AI-generated monthly cost-analysis reports: content framework, data sources, and a four-step generation process
AI-generated monthly cost analysis reports = content standards + data pi…
RISN-TG 012-2011 建设工程项目经理执业导则DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 03
Methods for identifying the major profit points and loss points in project cost planning (item-by-item revenue vs responsibility cost comparison, profit/loss ranking, and dynamic identification via three-cost comparison)
The core of identifying profit/loss points is an item-by-item "contract…
GB/T 51235-2017 建筑信息模型施工应用标准 9.3.1GB/T 50326-2017 建设工程项目管理规范 11.2.4/11.3.2/11.5.2GB/T 50358-2017 建设项目工程总承包管理规范 2.0.82026-09-25 - 04
Rolling forecast method for a project's estimated total cost, estimated gross profit and funding gap
Rolling forecast = each month replace forecast figures with actuals and…
GB/T 50358-2017 建设项目工程总承包管理规范2026-09-25 - 05
Linking project cost indicators with the schedule plan: preparation binding → earned value monitoring → synchronized adjustment (GB/T 50502 7.6, GB/T 50326 11.2, GB/T 50358 2.0.8)
Three bonds link cost and schedule: ① preparation — the cost management…
GB/T 50502-2009 建筑施工组织设计规范GB/T 50326-2017 建设工程项目管理规范GB/T 50358-2017 建设项目工程总承包管理规范2026-09-25 - 06
Calculating schedule deviations by the earned-value method (SV/SPI) and the four-step analysis procedure
Schedule deviations are calculated by earned value: SV = BCWP − BCWS (ne…
JGJ/T 121-2015 工程网络计划技术规程GB/T 50358-2017 建设项目工程总承包管理规范GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 07
Cost variance attribution analysis: three-factor decomposition into quantity, price, and efficiency variances (earned value routing + chain substitution method)
Split cost into the three factors "quantity × unit consumption × unit pr…
GB/T 50326-2017 建设工程项目管理规范 11.3.2/11.5.1~11.5.3GB/T 50358-2017 建设项目工程总承包管理规范 2.0.8T/ZSQX 023-2023 城镇给排水项目工程总承包管理规程 14.4.22026-09-25 - 08
Project loss early-warning indicator system: four-dimension indicators, threshold grading, and response mechanisms
Loss early warning sets indicators in four dimensions: ① cost variance (…
GB/T 50358-2017 建设项目工程总承包管理规范GB/T 50326-2017 建设工程项目管理规范RISN-TG 012-2011 建设工程项目经理执业导则2026-09-25