on-costs (indirect costs)
- 01
The computation programme of a single-item railway building and installation estimate (TB 10801-2024 Table 2.6.2): the 16-step accumulation order, each step's charging base, and where the special construction addition sits
Per TB 10801-2024 Table 2.6.2's sixteen accumulating steps: quota direct…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.6.2条及Table 2.6.2TB 10801-2024 第2.6.1条及图2.6.1(费用项目组成)TB 10801-2024 第2.6.3条及Table 2.6.3(设备单项概预算计算程序)2026-10-22 - 02
Determining overheads (company and site) and profit within the all-in unit rate: the dual track of the percentage-rate method and independent market-level measurement (including railway on-costs percentage rates)
Overheads (company and site) and profit are determined on the dual track…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第6.1.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.9.1条及Table 2.9.12026-10-18 - 03
Railway estimate/budget preliminaries and on-costs (indirect costs): composition, calculation base, and percentage rates (TB 10801-2024 Clauses 3.6/3.9; TB 10811-2024 Table 2.9.1)
Preliminaries (7 items: winter (cold-weather) and rainy-season construct…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.6、3.6、3.9条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.9节Table 2.9.12026-09-25 - 04
Railway 2024 estimates and budgets: dividing the cost scope between labour cost and on-costs - attribution to production workers (all-in labour cost) vs management personnel (overheads) (TB 10801-2024 clauses 3.1/3.9)
Labour cost means the various costs incurred for the production workers…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction ProjectsTB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works2026-09-25 - 05
Booking construction plant mobilization in railway 2024 preliminary estimates: merged into on-costs (indirect costs) within overheads (company and site) (contractor entry/exit and site-transfer costs), no overlap with plant entry/exit cost or heavy temporary works
The TB 10801-2024 preliminary estimate (budget) system has no stand-alon…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第 2.6、3.3、3.8、3.9 节)TB 10811-2024 铁路基本建设工程设计概(预)算费用定额(间接费费率Table 2.9.1、大临Table 2.8.2~2.8.4)TB/T 10814-2024 铁路工程施工机具台班费用定额(Ch. 3专用施工机械)2026-09-25 - 06
Railway construction-installation single-item estimate calculation program (TB 10801-2024 Table 2.6.2): 16-step accumulation and percentage-rate base rules — labor + machinery in the base; materials / out-of-price freight / price differences / fill material out; VAT separately listed
The single-item estimate for cost of works (construction and installatio…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第2.6节(图2.6.1、Table 2.6.2、Table 2.6.3)、第3.4节、第3.12条TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works2026-09-25 - 07
Overheads (company and site) within the all-in unit rate vs. site management fee within lump-sum preliminaries: distinction and prevention of duplicate charging
Overheads (company and site) are on-costs (indirect costs) in nature and…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25