bill of quantities (BOQ)
- 01
Divergent classification of trench, foundation pit and general earthwork: the BOQ measurement standard treats an excavation with bottom width no more than 3m and bottom length over 3 times the bottom width as a trench and anything beyond as a foundation pit (bottom width and bottom length both exclude working space); the consumption quota treats bottom width no more than 7m with bottom length over 3 times the bottom width as a trench, bottom length no more than 3 times the bottom width with bottom area no more than 150m2 as a foundation pit, and anything beyond as general earthwork. The two criteria run on separate tracks and must not be cross-inferred
BOQ itemisation follows the measurement standard: GB/T 50854-2024 Annex…
GB/T 50854-2024 App. A A.4.5、Table A.2.1、A.4.6、A.4.7DB11/T 2382-2024 第7.1.3、7.1.6、8.1.3条TB/T 10831-2024 册说明二2026-10-25 - 02
Determining BOQ attribution of gas pipelines: the boundary between GB/T 50856-2024 Appendix H (industrial piping) and Appendix K (water supply/drainage, heating, gas), and the division with municipal GB/T 50857-2024
Gas pipelines are not an either-or between "industrial piping" and "inst…
GB/T 50856-2024 通用安装工程工程量计算标准 App. H 工业管道工程(H.15.1、H.15.2、H.15.3、H.15.7、Table H.1.1、Table H.2.1、Table H.4.1、Table H.5.1)GB/T 50856-2024 通用安装工程工程量计算标准 App. K 给排水、采暖、燃气工程(Table K.1.1、K.9.1、K.9.6)GB/T 50857-2024 市政工程工程量计算标准 第3.0.4条、App. E 管网工程(E.5.2、E.5.4)2026-09-25 - 03
Distinguishing and applying tile (block) finishes vs stone finishes: separate BOQ items and three quota criteria (material -> size -> workmanship)
"Block finish" carries two senses — a collective chapter name (all slab…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(App. L Table L.2.1、App. M Table M.3.1)TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(Ch. 2 装饰装修工程)DB11/T 2382-2024 建设工程施工消耗量标准(App. A A.11.2 块料面层)2026-09-25 - 04
Liability for errors or omissions in the tender BOQ: GB 50500-2013 vs GB/T 50500-2024 (2013 Clause 4.1.2 mandatory provision vs 2024 Clause 3.1.8 split by unit-rate/lump-sum contract)
GB 50500-2013, Clause 4.1.2 (mandatory provision): 'the tender BOQ must…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.1.8、4.1.4、6.1.6、8.2.1、8.2.3条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第4.1.2条(已废止)住房城乡建设部公告2024年第212号(2024-11-26,www.mohurd.gov.cn)2026-09-25 - 05
Overview of bills of quantities: composition, compilation, item descriptions and handling of errors/omissions (GB/T 50500-2024)
A bill of quantities comprises four sections — trade items, preliminarie…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25 - 06
GB/T 50860-2024 structures measurement standard: pool and chimney work-item setup, calculation rules, member boundary attribution, and the twelve-digit item code rules
In GB/T 50860-2024 (effective 2025-09-01, replacing GB 50860-2013), pool…
2026-09-25 - 07
Linking the five document types — contract, drawings, BOQ, site instructions / variation records, settlement — and managing the settlement chain of evidence
Using unified codes as the bond, lineage relations attached via linking…
GB/T 50500-2024 建设工程工程量清单计价标准T/ZBD 100.5-2023 建设工程结算审核作业指引GB/T 51095-2015 建设工程造价咨询规范2026-09-25 - 08
GB/T 50854-2024 removes "beam-and-slab": beams and slabs are coded and listed separately (combined application for solid slabs)
GB/T 50854-2024 has removed the "beam-and-slab" BOQ item (the 2013 editi…
GB/T 50854-2024 App. E.7.4GB 50854-2013 Table E.5(已废止)2026-09-25 - 09
A seven-step process for systematically checking BOQ errors and omissions (BOQ defects) and defect-liability handling
With tender drawings, the calculation-standard appendices, and the tende…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25