Advance payment rules for the statutory safety provisions (mandatory health, safety and environmental (HSE) provisions) compared: GB 50500-2013 Clause 10.2.2's 60% vs GB/T 50500-2024 Clause 9.3.2's 50%, no recovery from progress payments, one-time recovery at final account

The advance percentage for the mandatory health, safety and environmental (HSE) provisions (renamed "statutory safety provisions" in the 2024 standard) has dropped from 60% to 50%: GB 50500-2013 (repealed) Clause 10.2.2 required an advance of not less than 60% of the current year's planned total within 28 days of commencement; GB/T 50500-2024 (current) Clause 9.3.2 changes this to not less than 50% of the total and adds the explicit recovery rule that "the advance for the statutory safety provisions shall not be recovered when computing progress payments due and shall be recovered in one lump sum at final account". The advance window (within 28 days of commencement) is unchanged.

Applicable Codes

  • GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第9.3.2条
  • GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第10.2.2条(已废止,被2024版替代)
  • TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.11.11条
  • TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.11.9条

Topic Positioning

Old-vs-new comparison of the advance percentage and recovery rules for the statutory safety provisions (called "mandatory health, safety and environmental (HSE) provisions" in the 2013 edition): GB 50500-2013 Clause 10.2.2's "60% advance" has been replaced by GB/T 50500-2024 Clause 9.3.2's "50% advance", and the recovery rule changes from unstated to "no recovery from progress payments; one-time recovery at final account". Applies to checking the advance floor and drafting payment terms in employer-contractor pricing practice.

Core Conclusions

Old rule, GB 50500-2013 Code of Bills of Quantities and Valuation for Construction Works, Clause 10.2.2 (replaced): "The employer shall, within 28 days of commencement, advance not less than 60% of the total HSE provisions in the current year's programme of works, decompose the remainder under the early-arrangement principle, and pay it at the same time as the progress payments."

New rule, GB/T 50500-2024 Standard for BOQ Pricing of Construction Works, Clause 9.3.2 (current): "The employer shall, within 28 days of commencement, advance not less than 50% of the total statutory safety provisions to the contractor; the remainder shall be decomposed under the early-arrangement principle and paid at the same time as the progress payments. For major works implemented across years, the advanced total of the statutory safety provisions may be decomposed and calculated by the annual programme of works. When computing the progress payments due, the parties shall not recover the advanced statutory safety provisions. The safety provisions shall be decomposed under the early-arrangement principle and recovered in one lump sum at final account."

Key changes: (1) the name changed from "mandatory health, safety and environmental (HSE) provisions" to "statutory safety provisions"; (2) the advance percentage dropped from not less than 60% of the current year's planned total to not less than 50% of the total; (3) the advance window is unchanged (within 28 days of commencement); (4) new: for major works implemented across years, the advanced total may be decomposed and calculated by the annual programme of works; (5) the recovery rule is made explicit for the first time - no recovery when computing progress payments due, one-time recovery at final account (the 2013 edition did not state how recovery was made).

The commentary to the 2013 edition (Section 10.2) further records: the content of the HSE provisions follows the "Measures for the Administration of Withdrawal and Use of Enterprise Work Safety Costs" issued by MOF and SAWS and the current national measurement codes for the relevant works; if the employer still fails to pay within 7 days after the payment period expires and a safety accident occurs, the employer shall bear the corresponding liability; the contractor shall apply the HSE provisions to their designated purpose only, list them separately in its financial accounts for inspection, and shall not divert them, otherwise the employer has the right to require rectification within a time limit, and if not rectified by that time, the resulting losses and/or delay are borne by the contractor.

Applicable Boundaries

  • Scope: employer-contractor pricing of building works, municipal works and similar under the Standard for BOQ Pricing of Construction Works (GB/T 50500-2024).
  • Version transition: newly tendered or newly signed contracts follow the 2024 floor of 50%; existing contracts expressly citing the 2013 clauses are still governed by their terms.
  • The advance here means the advance within 28 days of commencement, which is a different cost from the works advance payment (materials advance, Section 9.2 of GB/T 50500-2024, 10%-30% of the contract price) - do not confuse the two.
  • Railway works: the counterpart of the HSE provisions is the "statutory work safety levy (earmarked funds)" (per TB 10801-2024 Clause 3.11.11), billed at 3.0% of the cost of works (construction and installation), non-competitive and ring-fenced; the railway rules themselves do not set out a separate advance percentage, so in practice it follows the contract and the national standard by reference.
  • Consequences of late payment: 2013 edition Clause 10.2.3 (if still unpaid 7 days after the payment period expires and a safety accident occurs, the employer bears liability); 2024 edition Clause 9.3.3 - details per the original wording of the standards.

Further Reading

  • GB/T 50500-2024 Standard for BOQ Pricing of Construction Works, Clause 9.3.2 (interim payment of the contract price - advance of the statutory safety provisions), Clause 9.3.3 (consequences of late payment), Clause 2.0.4 (term definition of the statutory safety provisions).
  • GB 50500-2013 Code of Bills of Quantities and Valuation for Construction Works, Clauses 10.2.2 and 10.2.3 and the commentary to Section 10.2 (repealed, replaced by the 2024 edition).
  • Railway basis: TB 10801-2024 Administrative Compilation Rules for Estimates and Budgets of Railway Works, Clause 3.11.11 (correspondence between the work safety cost and the HSE provisions); TB 10811-2024 Norms for On-Costs and Expenses of Railway Works, Clause 2.11.9 (work safety cost billed at 3.0% of the cost of works).
  • MOF and SAWS "Measures for the Administration of Withdrawal and Use of Enterprise Work Safety Costs" (content basis for the HSE provisions).