bill of preliminaries
- 01
Constituent requirements of BOQ item descriptions and the three common defects (vague description / missing measurable parameters / disconnect from the work process), with corrected drafting (GB/T 50500-2024 clauses 2.0.5, 2.0.27, 4.1.7, 4.2.2, 4.2.4; GB/T 50854-2024 clause 4.1.2)
An item description, by definition (GB/T 50500-2024 clause 2.0.5), is 'a…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.5条、第2.0.27条、第4.1.4条、第4.1.7条、第4.2.2条、第4.2.4条、第6.1.6条、第6.1.7条、第8.2.1条、第8.9.1条GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第4.1.2条、App. E Table E.2.1(现浇混凝土构件,code 010502)2026-11-08 - 02
Content and pricing methods of preliminaries: the 2024 definition (clause 2.0.3), the listing basis (GB/T 50854-2024 annex R table R.1.1 preliminary items, code 011601), the three pricing methods of unit rate / lump sum / percentage rate and their preferred use (clauses 2.0.10 to 2.0.12, 3.2.1), the completion rules of annex E tables E.3.1 to E.3.4, and the non-competitive rule for statutory safety provisions (clause 3.2.5)
Preliminaries are 'project costs incurred in taking the relevant measure…
GB/T 50500-2024 第 2.0.3 条(措施项目术语)GB/T 50500-2024 第 2.0.10~2.0.12 条(单价计价/总价计价/费率计价)GB/T 50500-2024 第 3.2.1 条(措施项目清单计价方式)2026-11-01 - 03
Composition of the tender bill of quantities: the five parts of GB 50500-2013 (bill of divisional and elemental work items, bill of preliminaries, bill of provisional sums and other charges, bill of statutory levies, bill of taxes and duties) with the itemisation rules of each, and the composition contrast under GB/T 50500-2024
GB 50500-2013 Clause 4.1.4: the tender bill of quantities shall be compi…
GB 50500-2013 建设工程工程量清单计价规范 第4.1.1~4.1.4条、第4.2.1~4.2.2条、第4.3.1~4.3.2条、第4.4.1~4.4.6条、第4.5.1~4.5.2条、第4.6.1~4.6.2条GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第3.1.2条、第3.1.6条、第3.1.8条、第3.2.1条、第3.2.11条、第4.1.4条、第4.1.7条、第4.2.1~4.2.8条2026-10-25 - 04
The dividing line between unit-rate and lump-sum preliminaries in the bill of preliminaries: the 'whether quantities can be computed' binary test of GB 50500-2013 section 4.3, and how it is landed as itemisation and coding in GB 50854-2013 Annex S and GB/T 50854-2024 Annex R
The commentary to GB 50500-2013 clause 4.3.2 takes 'whether quantities c…
GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第 4.3.1 条(强制性条文)、第 4.3.2 条及条文说明GB 50854-2013 · Code for Measurement of Quantities of Building and Decoration Works 第 4.2.7 条、第 4.3.1 条(强制性条文)、第 4.3.2 条、App. S Table S.1/S.2/S.3/S.5/S.6/S.7GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第 4.3.1 条、App. R Table R.1.1(011601)、R.2.2、R.2.3、App. E Table E.5.1(010505)2026-10-25 - 05
Overview of bills of quantities: composition, compilation, item descriptions and handling of errors/omissions (GB/T 50500-2024)
A bill of quantities comprises four sections — trade items, preliminarie…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25 - 06
Checking drawing-BOQ contradictions (bill of quantities defects) before bid pricing, and responsibility boundaries (GB/T 50500-2024)
Drawing-BOQ contradictions are "BOQ defects" (extra items/omissions/mism…
GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 07
GB/T 50500-2024: definitions of the three pricing methods (unit rate / lump sum / rate-based) and their applicability to each BOQ category
GB/T 50500-2024 provides: work-section BOQ items and day-work items shou…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.10~2.0.12、3.1.5、3.2.1、3.2.7条2026-09-25 - 08
Bill of preliminaries classification basis difference between GB/T 50500-2024 and GB 50500-2013: two-way split by measurability vs three pricing methods (unit-rate/lump-sum/percentage-rate)
GB 50500-2013 split preliminary items by 'whether quantities can be comp…
GB 50500-2013 建设工程工程量清单计价规范 第4.3.2、6.2.3、6.2.4条GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.10~2.0.12、3.1.5、3.2.1条及App. ETable E.3.22026-09-25 - 09
Risk allocation and adjustment rules for preliminaries (measure) costs: GB 50500-2013 vs GB/T 50500-2024 (omitted items, scheme changes, lump sum plus exceptions)
The 2024 edition restructures preliminaries as "lump sum plus exceptions…
GB 50500-2013 建设工程工程量清单计价规范(第4.1.2、9.3.1~9.3.2、9.5.3条,已废止)GB/T 50500-2024 建设工程工程量清单计价标准(第3.1.8、3.3.3、3.3.7、6.1.5、7.3.1、8.2.2~8.2.3、8.9.4~8.9.7条)2026-09-25 - 10
Methods and liability basis for ensuring completeness of the bill of preliminaries at construction main (general) contracting tender stage (GB/T 50500-2024)
Per GB/T 50500-2024 clause 6.1.5, whether a re-measurable (unit-rate) or…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.2.5条、第3.2.6条、第3.5.4条、第4.2.5条、第6.1.5条2026-09-25 - 11
Nature and pricing rules of statutory safety provisions (GB/T 50500-2024: non-competitive item, whole-process constraints, and the change in normative force)
GB/T 50500-2024 Clause 3.2.5 states that the statutory safety provisions…
GB/T 50500-2024 建设工程工程量清单计价标准(第2.0.4、3.2.5、5.2.5、6.2.6、9.3.1、9.3.4条,App. ETable E.3.2)GB 50500-2013 建设工程工程量清单计价规范(第4.1.5条,已随版本更新)建办〔2005〕89号 建筑工程安全防护、文明施工措施费用及使用管理规定2026-09-25