measurement period
- 01
GB 50500-2013 terms for measurement of the works and construction payment settlement (final account): definitions, clause anchors, side-by-side comparison, and the rules that carry confirmed measurements into the settlement summary, with the corresponding clauses of GB/T 50500-2024
GB 50500-2013 clause 2.0.43 defines 'measurement of the works' as the ca…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.34、2.0.35、7.1.1、7.1.4、7.1.5、7.1.7、7.1.8、8.11.22、9.4.1、9.4.13、10.1.4、10.2.1、10.2.3、10.2.7、10.3.1、10.3.2、10.3.3、10.3.4、10.3.7、10.3.8、10.3.10、10.3.11、10.3.16条、Ch. 11GB/T 50875-2013 · Standard glossary of project costs 第3.4.3、3.4.9条GF-2017-0201《建设工程施工合同(示范文本)》第12.3.2、12.3.3、12.3.4项、第12.4.2、12.4.3、12.4.4项2026-11-01 - 02
Reconciling the three output-value bases of construction output, measured output and settlement output: item-by-item basis distinction, four classes of difference attribution, the disallowance-and-resubmission tests, and the tie-out with stage settlement documents
Construction output value (physical-progress statistics basis), measured…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第7.1.5、7.1.7、7.1.8、8.9.1、8.11.3、8.11.21、9.4.1、9.4.9、9.4.13、10.1.6、10.2.1、10.2.3、10.2.4、10.2.8、10.3.2、10.3.14条GB/T 50319-2013 · Code for Construction Project Supervision 第5.3.1、6.3.4条DBJ41/T 208-2018 · Standard for Construction Project Supervision Work (Henan) 第7.3.2条2026-10-25 - 03
The "double 80%" rule for progress-payment and in-process settlement payment ratios: GB/T 50500-2024 Clauses 9.1.7 and 10.2.4 vs GB 50500-2013 Clause 10.3.7 (60%-90%)
GB/T 50500-2024 raises the payment floor from 2013's 60% to 80% and remo…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第9.1.7、9.2.2、9.2.6、9.3.2、9.4.1、9.4.9、9.4.11、10.2.4条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第10.3.7条(已被GB/T 50500-2024替代,仅作历史对照)GB/T 50319-2013 · Code for Construction Project Supervision 第5.3.1条2026-10-18 - 04
Composition of multi-month construction material published price information (government guidance prices): three methods for determining multiple market prices within a measurement period (GB/T 50500-2024 Appendix A.2.3 — arithmetic mean / quantity-weighted / price for the main consumption period)
Multi-month construction does not automatically mean weighting: when mea…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works App. A.2.1、A.2.3、A.2.5、A.1.5GB/T 50500-2024 第3.3.5条、8.7.1~8.7.6条GB/T 50500-2024 App. GTable G.2.1-12026-09-25 - 05
Taking and weighting published price information for materials across multiple months: default per-period adjustment; weight only when one measurement period spans price issues (GB/T 50500-2024 Appendix A.2)
Per GB/T 50500-2024: for construction spanning measurement periods (e.g…
GB/T 50500-2024 建设工程工程量清单计价标准(第7.1.3条、App. A.2.1~A.2.5、App. GTable G.2.1-1、第8.7.2条、第3.3.5条)2026-09-25 - 06
Composition of progress-payment application documents and the submission-signoff procedure (GB/T 50500-2024 §9.4, Appendix F; T11 IESB 0001-2017 Tables 4.1.8/4.1.11; GB/T 50319-2013 §5.3.1)
Application documents fall into four blocks: (1) forms (the Progress Pay…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第9.4.9条、第9.4.11条、App. FTable F.3.1T11 IESB 0001-2017《建筑电气工程施工资料管理规程》表4.1.8、表4.1.11GB/T 50319-2013 · Code for Construction Project Supervision 第5.3.1条2026-09-25 - 07
Appendix G main materials (adjustment) list of GB/T 50500-2024: locking stage and adjustment-quantity caliber (contract annex / completed quantities per measurement cycle)
Tables G.2.1-1/2 are filled during tendering and locked as a whole as a…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works App. G Table G.2.1-1/G.2.1-2GB/T 50500-2024 第3.3.5条GB/T 50500-2024 App. A.2.12026-09-25 - 08
Handling rules when the price-information issue and the construction month are misaligned (GB/T 50500-2024 Appendix A adjustment)
Price-information adjustment takes the issue corresponding to the measur…
GB/T 50500-2024 App. A.2.1~A.2.5GB/T 50875-2013 第2.1.16条T/ZBD 100.1-2022 第7.2.3条2026-09-25 - 09
Measurement linkage between GB/T 50500-2024 and the nine measurement standards GB/T 50854-50862-2024: responsibilities, cycles, and the division of procedures (procedures to the pricing standard, quantity take-off to the measurement standards)
GB/T 50500-2024 and the nine measurement standards (GB/T 50854-50862-202…
GB/T 50500-2024 建设工程工程量清单计价标准(Ch. 7、第9.4节、第3.3.8条)GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(第1.0.2、3.0.2、3.0.4、4.1.1、4.2.6条)GB/T 50860-2024 构筑物工程工程量计算标准(第3.0.4条)2026-09-25 - 10
The relation between measurement and payment: quantities fixed before payment (the causal chain of GB/T 50500-2024 Chapters 7 and 9)
Measurement is the precondition and quantitative basis of payment, and p…
GB/T 50500-2024 建设工程工程量清单计价标准 Ch. 7/Ch. 9/Ch. 10GB/T 50319-2013 建设工程监理规范 第5.3.1条DB13(J)/T 8161-2019 建设工程监理工作标准 第8.2.2条2026-09-25 - 11
Price reference time point for final account: adjust period by period per each measurement period's published price information (government guidance prices) during construction and aggregate; interim settlements by construction stage (China's 2020 milestone-based interim settlement system; no exact international equivalent) are incorporated without recomputation (not a single issue at the month of completion)
A final account has no 'single settlement-period price information': con…
GB/T 50500-2024 建设工程工程量清单计价标准 App. A.2、Ch. 10、App. E.6.1GB/T 50875-2013 工程造价术语标准T/ZBD 100.1-2022 建设工程造价数据建设通用标准2026-09-25