Splitting the remedy paths and procedural requisites when material prices rise: whether to go first for contract price adjustment (price adjustment for cost fluctuation) or for a works claim; the time limits, written requisites and negotiation sequence of each path; and the consequences of a missed or wrong procedure (GB/T 50500-2024 cl. 8.7, cl. 8.11 and Annex A; Civil Code art. 533; Fa Shi [2026] No. 12 art. 9)
The first path for a material price rise is contract price adjustment, n…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.7.2、8.7.3、8.7.4、8.7.6、8.1.3、8.1.6、8.11.2、8.11.3、8.11.5、11.1.1条及App. A(A.2.5)、App. GTable G.2.1GF-2017-0201 建设工程施工合同(示范文本)通用合同条款第11.1款、第11.2款中华人民共和国民法典 第五百三十三条2026-11-08 - 02
Distinguishing claims for extension of time from cost claims: an axis-by-axis comparison of the two independent remedies, time and money, on causation threshold (critical path), basis of calculation (delay duration / total float vs actual-cost method / total-cost method), whether profit is claimable, evidence and time limits, plus the rules of combined calculation and joint approval where both are claimed together
An EOT claim asks for time, a cost claim asks for money; both are econom…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.31条、第8.11.1~8.11.13条T ZBD 100.5-2023 建设工程结算审核作业指引 第3.1.9条T ZBD 100.4-2023 建设工程造价鉴定作业指引 第4.7.3~4.7.5条2026-11-01 - 03
Model Contract for Construction Projects (EPC) (GF-2020-0216), General Conditions Clause 19 [Claims]: the claims procedure - Notice of Claim within 28 days, claim report within 28 days, deemed approval where no reply is given within 42 days, and expiry of the right to claim after the completion payment certificate
Under GF-2020-0216 Sub-Clause 19.1, the claiming party shall submit a No…
建市〔2020〕96号《建设项目工程总承包合同(示范文本)》GF-2020-0216 通用合同条件第19条(19.1~19.4)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11.2、8.11.3、8.11.4、8.11.5、8.11.6、8.11.21条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第9.13.2、9.13.3条(已废止)2026-11-01 - 04
Cost treatment of re-drilling after borehole collapse in cast-in-place piling: attribution of rework responsibility (employer cause / contractor cause / adverse physical conditions), the on-site confirmation evidence chain, the measurable cost heads, responsibility for concrete over-consumption coefficient excesses, and the 28-day claim procedure
Whether the cost of re-drilling after collapse can be measured depends o…
GB/T 50500-2024 建设工程工程量清单计价标准 第7.1.4条、第7.6.4条、第8.11.3条GB/T 51262-2017 建设工程造价鉴定规范 第5.8.4条GB/T 50319-2013 建设工程监理规范 第5.2.11条及Table A.0.62026-10-29 - 05
Whether an extension-of-time claim can succeed without a site instruction record confirming the extension from the employer or the supervising engineer: the two-limb rule of Fa Shi [2020] No. 25 Article 10, the treatment of contract terms deeming no extension where no application is made in time, the two exceptions, and the linked 28-day claim procedure milestones
Fa Shi [2020] No. 25 Article 10 paragraph 1: where the parties agree tha…
《最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释(一)》法释〔2020〕25号 第十条《最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释(二)》法释〔2026〕12号 第二十三条《建设工程工程量清单计价标准》GB/T 50500-2024 第8.11.3条2026-10-29 - 06
Extension of time caused by late delivery of employer-supplied (free-issue) materials: the statutory right to an extension (Civil Code Articles 803 / 804), three-tier quantification through the critical path and total float, an affirmative / negative scenario matrix, and procedural forfeiture of claims
Yes. Where employer-supplied materials fail to arrive at the time and to…
《中华人民共和国民法典》第八百零三条《中华人民共和国民法典》第八百零四条GB/T 50500-2024 建设工程工程量清单计价标准 第3.6.5条、第8.11.3条、第8.11.7条、第8.11.8条、第8.11.9条、第8.11.10条2026-10-29 - 07
Whether a contractor that fails to apply for an extension of time (an EOT claim) within the contractually agreed period forfeits the right to extension: the two-paragraph rule of Article 10 of Fa Shi [2020] No. 25, the two exceptions of the employer's subsequent consent and the contractor's reasonable justification, and the three-way split by the state of the contractual agreement
Not necessarily forfeited. Fa Shi [2020] No. 25, Article 10, paragraph 1…
最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释(一)(法释〔2020〕25号)第十条最高人民法院关于审理建设工程施工合同纠纷案件适用法律问题的解释(二)(法释〔2026〕12号)第二十三条(2026年6月30日施行)https://www.court.gov.cn/fabu/xiangqing/504221.html中华人民共和国民法典(主席令第45号)第一百四十条、第八百零三条、第八百零四条2026-10-29 - 08
The force majeure processing chain: immediate notice -> continuing interim reports -> final report within 28 days after the end of the event -> Notice of Claim and claim report -> review and reply by the other party -> confirmation, signing and concurrent payment, plus the 84-day/140-day termination exit (GF-2017-0201 Clauses 17.2/17.4/19 and GB/T 50500-2024 Clauses 8.11.3/8.11.5/8.11.21)
After a force majeure event occurs, the party shall immediately notify t…
GF-2017-0201 建设工程施工合同(示范文本)第17.2款〔不可抗力的通知〕GF-2017-0201 第17.4款〔因不可抗力解除合同〕GF-2017-0201 第19.1~19.5款〔索赔〕、第20条〔争议解决〕、第4.4款〔商定或确定〕2026-10-25 - 09
GF-2017-0201 Model Construction Contract, General Conditions clause 19.1, the contractor claims procedure chain: Notice of Claim (short form, event grounds only) - claim report (detailed form: claim grounds + additional payment amounts and/or extension of time + supporting records) - continuing claim notice - final claim report; two separately running 28-day periods and the time-bar consequences of missing them
Under General Conditions clause 19.1 of GF-2017-0201: the Notice of Clai…
GF-2017-0201《建设工程施工合同(示范文本)》通用条款第19.1、19.2、19.5条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第9.13节〔索赔〕、第9.14节〔现场签证〕(已被GB/T 50500-2024替代)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11节〔工程索赔〕2026-10-25 - 10
The columns and content of the Notice of Claim for works claims: the division of detail between notice and formal claim report, the prescribed forms and the clause basis
The system splits claim documents into two levels: the Notice of Claim (…
GB/T 50500-2024 第8.11.2、8.11.3、8.11.4、8.11.5、8.11.21条GB/T 50319-2013 第6.4.3、6.4.4、6.4.5条及App. BTable B.0.13、App. CTable C.0.3DB37/T 5028-2022 第9.5.4条2026-10-18 - 11
Time limits for giving and processing claims for extension of time and cost under GB/T 50500-2024 clause 8.11 (dual 28-day nodes applying in both directions, 14-day request for further particulars), consequences of default, the nature of claims and the evidence checklist
Claims for time or cost follow dual 28-day nodes: a written Notice of Cl…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.11.1、8.11.2、8.11.3、8.11.4、8.11.5、8.11.6、8.11.7、8.11.21条GB/T 50500-2024 第11.1.1、11.1.2、11.1.4、11.1.5、11.2.4~11.2.8、11.4.1、11.4.3、11.4.5条2026-10-11 - 12
Delay claims for design changes: critical-path determination, the time/cost double ledger, and the 28-day procedure
Delay caused by events not attributable to the contractor, such as desig…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51262-2017 建设工程造价鉴定规范TB 10402-2019 铁路建设工程监理规范2026-09-25 - 13
Evolution of the 28-day time limit for construction claims: GB 50500-2013 'forfeiture of the right to claim' vs GB/T 50500-2024 'may be deemed waived', and the 28-day fallback where the contract is silent
GB 50500-2013 (abolished), Clause 9.13.2: the contractor shall submit a…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.11节GB 50500-2013 建设工程工程量清单计价规范 第9.13.2条(已废止)2026-09-25 - 14
Re-work confirmation requirements and claim procedure deadlines for material scrap from variations/employer-risk events: notice of intent within 28 days, claim report, employer reply in 14/28 days, and deemed waiver/acceptance on default (GB/T 50500-2024, 7.6.1/8.11.3/8.11.5)
Material-scrap claims require a written re-work confirmation demand with…
GB/T 50500-2024 第7.6.1条GB/T 50500-2024 第8.11.3条GB/T 50500-2024 第8.11.5条2026-09-25 - 15
Claims under FIDIC 2017 (Red/Yellow Book Chapter 20) compared with construction claims under China's GB/T 50500-2024: institutional positioning, the hard/soft divide of the 28-day time bar, and the procedural nodes of claims in both directions
FIDIC 2017's Claim is a "procedure unifier" - clause 20.1 (a)(b)(c) cove…
FIDIC Conditions of Contract for Construction(红皮书 2017 第二版)第20章 20.1~20.2.7FIDIC Conditions of Contract for Plant and Design-Build(黄皮书 2017)第20章GB/T 50500-2024 建设工程工程量清单计价标准 第8.1.1、8.11.1~8.11.6条2026-09-25 - 16
Claim costs in the final account: settlement line item + 28-day procedure chain + review and determination rules
Claim costs enter the final account only where both procedural complianc…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51262-2017 建设工程造价鉴定规范DBJ41/T 208-2018 建设工程监理工作标准2026-09-25 - 17
Timing of site instructions and certified records: sign before work in advance, record as events occur during work, and complete retrospective certification within time limits afterwards
Site instructions and certified records are not a binary "before constru…
GB/T 51262-2017 建设工程造价鉴定规范GB/T 50500-2024 建设工程工程量清单计价标准T/SDJZXH 004.1-2022 城市轨道交通工程监理工作标准2026-09-25