errors and omissions in the BOQ
- 01
Judging the code non-compliance of 'cut only, never add' in final account review, the clause basis for the contractor's claim to symmetric upward review (the full-review method, objective and fair deliverables, two-way quantity-difference pricing, BOQ errors on the employer), and the entrances for upward adjustment and the written-objection remedy
'Cut only, never add' has no code basis: GB/T 51095-2015 clause 8.3.5 re…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.27、3.1.8、8.2.1、8.9.1、8.9.2、10.3.8、10.3.10、10.3.12条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第4.1.2(强制性条文)、9.4、9.5、9.6.1、9.6.2、9.6.3、11.3.6条GB/T 51095-2015 · Code for construction cost consultation 第1.0.3、8.3.5、8.3.8条2026-11-09 - 02
Differences in final account adjustment between lump-sum contracts (fixed total price) and unit-rate contracts (fixed unit rates): treatment rules for quantity changes, BOQ errors, design changes and cost fluctuation, mapped to GB/T 50500-2024 clause numbers
GB/T 50500-2024 uses 'lump-sum contract / unit-rate contract' rather tha…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.6条、第2.0.7条GB/T 50500-2024 第3.3.5条、第3.4.6条GB/T 50500-2024 第4.1.4条、第4.1.6条、第6.1.7条2026-11-08 - 03
Checking order when pipe specifications on the drawings conflict with the BOQ description: the dimension figures on drawings govern and conflicts are clarified through drawing review; at pricing level, unit-rate contracts follow the bill of quantities and lump-sum contracts follow the contract drawings and specifications
The test runs on two levels. (1) Annotation level: dimensions on drawing…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.4.5条、第2.0.27条、第8.2节GB/T 50856-2024 通用安装工程工程量计算标准 第4.2.4条、App. K Table K.1.1GB/T 50106-2010 建筑给水排水制图标准 第2.4.2条2026-11-08 - 04
Classifying divergence between the design earthwork balance and the actual site balance, allocating responsibility among the four parties, and the cost adjustment pathway (with the chain of evidence and the normative basis)
GB 50201-2012 clause 4.1.3 sets the division-of-duty baseline: the balan…
GB 50201-2012 土方与爆破工程施工及验收规范 第4.1.3条GB/T 50500-2024 建设工程工程量清单计价标准 第3.1.8、3.3.2、4.1.6、7.2.2、8.2.1、8.9.1、8.9.2、8.11.3条GF-2017-0201 建设工程施工合同(示范文本)第7.4、7.5、7.6、7.7、7.8条2026-11-08 - 05
Constituent requirements of BOQ item descriptions and the three common defects (vague description / missing measurable parameters / disconnect from the work process), with corrected drafting (GB/T 50500-2024 clauses 2.0.5, 2.0.27, 4.1.7, 4.2.2, 4.2.4; GB/T 50854-2024 clause 4.1.2)
An item description, by definition (GB/T 50500-2024 clause 2.0.5), is 'a…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.5条、第2.0.27条、第4.1.4条、第4.1.7条、第4.2.2条、第4.2.4条、第6.1.6条、第6.1.7条、第8.2.1条、第8.9.1条GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第4.1.2条、App. E Table E.2.1(现浇混凝土构件,code 010502)2026-11-08 - 06
Deciding claims to adjust the contract price for omitted items in the tender BOQ (BOQ errors) during performance: risk is allocated by the contract pricing method and the BOQ section in which the omission falls - omission from the work-section bills under a unit-rate contract may rest with the employer and be adjusted under section 8.2; a lump-sum contract is in principle not adjusted (except provisional quantity items); the bill of preliminaries is always the contractor's responsibility - with judicial limits and points of procedure and proof
Whether adjustment is possible depends not on the omission itself but on…
《建设工程工程量清单计价标准》GB/T 50500-2024 第3.1.8、3.5.4、4.1.4、6.1.6、6.1.7、8.1.3、8.2.1、8.2.2、8.2.3、8.9.1、8.9.2条《中华人民共和国民法典》第五百一十条、第五百三十三条、第七百九十三条最高人民法院法释〔2020〕25号《关于审理建设工程施工合同纠纷案件适用法律问题的解释(一)》第十九条、第二十二条2026-10-29 - 07
The boundary and pricing routes between BOQ errors and omissions and variations: distinguished by the two comparison benchmarks 'contract BOQ vs contract drawings' and 'contract drawings vs actual construction drawings', mapping respectively to BOQ-error price adjustment under Section 8.2 and variation valuation under Section 8.9 of GB/T 50500-2024
GB/T 50500-2024 Article 7.2.1 draws the line by benchmark: 'a discrepanc…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第7.2.1条、第8.2.1条、第8.2.2条、第8.2.3条、第8.9.1条、第8.9.2条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.1.8条、第4.1.4条、第6.1.7条2026-10-29 - 08
Preliminaries — the "lump sum, no adjustment" principle and the full landscape of adjustable exceptions (GB/T 50500-2024 cl. 3.3.7, 7.3.1)
Under GB/T 50500-2024, the China national pricing standard for BOQ (Code…
GB/T 50500-2024 第3.3.7条(措施费包干与三类例外)GB/T 50500-2024 第7.3.1条(措施项目计量调整封闭清单)GB/T 50500-2024 第7.4.4、8.9.4、8.9.5、8.9.6、8.9.7条(工程变更引起措施项目计量与计价)2026-10-25 - 09
Tender BOQ versus priced BOQ - relationship and effect compared: preparing and pricing parties, document status, content differences, accuracy responsibility (2013 edition clause 4.1.2 versus 2024 edition clause 3.1.8 split by unit-rate and lump-sum contracts), benchmark role in settlement (quantity variance under 9.6.2, variation valuation under 9.3.1), effect of unilateral amendment, and the order of precedence of contract documents
The two bills are not two documents but two stages of one bill: the tend…
GB 50500-2013 建设工程工程量清单计价规范 第2.0.2、2.0.3、4.1.2、4.1.3、9.3.1、9.6.2条GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.18、3.1.8、3.4.5、6.1.6、6.1.7、6.1.9、7.2.1条、第8.2节、第8.9节GF-2017-0201 建设工程施工合同(示范文本) 通用合同条款第1.5款2026-10-25 - 10
Price adjustment findings for 'mismatching item descriptions' under GB 50500-2013 Section 9.4: the elements of cl. 9.4.1/9.4.2, re-determining the all-in unit rate per the as-executed item description using the cl. 9.3 method, and the clause mapping after the 2024 edition merged this event into 'errors and omissions in the BOQ'
GB 50500-2013 cl. 9.4.2 provides: where, during performance, the design…
GB 50500-2013 第9.4.1条GB 50500-2013 第9.4.2条GB 50500-2013 第9.4节说明2026-10-25 - 11
Bills of quantities errors (item description mismatches, wrong or missing items, quantity deviations): determination, attribution of responsibility and the quantity-then-price adjustment sequence, including the split between unit-rate and lump-sum contracts and the 15% threshold rule
Where the BOQ and the drawings are inconsistent, the sequence is 'decide…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.27、3.3.2、3.4.7、4.1.4、4.1.6、6.1.7、7.2.1、8.2.1、8.9.1条GB/T 50319-2013 建设工程监理规范 第6.3.3条T/ZBD 100.4-2023 建设工程造价鉴定作业指引 第4.4.4条2026-10-25 - 12
Re-measurement and price adjustment rules after quantity changes caused by variations or BOQ errors: recalculating from the variation instruction and the actual construction drawings, the separate track for BOQ errors, the 15% banded unit-rate adjustment, and the scheme-approval precondition for pricing preliminaries and new preliminary items (GB/T 50500-2024 clauses 7.4.2-7.4.4, 8.2.1, 8.9.1-8.9.2; GB 50500-2013 clauses 9.3.1, 9.3.2, 9.6.2)
Re-measurement after a variation takes as its basis the quantities recal…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第7.4.2条、第7.4.3条、第7.4.4条、第8.2.1条、第8.9.1条、第8.9.2条、第8.9.4条、第8.9.6条、第8.9.7条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第9.3.1条、第9.3.2条、第9.6.2条GF-2017-0201《建设工程施工合同(示范文本)》第10.4条2026-10-25 - 13
The source definition, pricing basis and final account aggregation of the three kinds of quantities (contract BOQ quantities / variation quantities / dayworks record quantities), including the comparison baselines for BOQ errors - variation - additional works and the one-gateway-only rule against double measurement (GB/T 50500-2024 clauses 7.2, 7.3, 7.4, 7.5, 8.2, 8.6, 8.9, 8.10, 8.11, 10.3; compared with GB 50500-2013 clauses 9.3, 9.14, 11.2)
Clause 7.4.1 of GB/T 50500-2024 draws the boundary with three comparison…
GB/T 50500-2024 建设工程工程量清单计价标准 第7.1.7、7.1.8、7.2.1、7.3.1、7.4.1、7.4.2、7.4.4、7.5.3~7.5.6、8.2.1、8.6.2~8.6.4、8.9.1、8.9.2、8.10.1、8.11.1、10.3.2、10.3.3条GB 50500-2013 建设工程工程量清单计价规范 第9.3.1、9.3.2、9.14.1~9.14.4、9.15.2、11.2.4条2026-10-25 - 14
Boundary distinctions among omitted BOQ items (BOQ errors), provisional prices, provisional sums, dayworks and site instruction records in contract price adjustment: required but not listed vs listed but unpriced vs confirmation evidence for unforeseen matters
Under GB/T 50500-2024: omission falls under 'BOQ errors' (clause 2.0.27…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.27、7.2.1、8.2、8.3.1、8.3.2、8.3.5、8.4.1、8.4.5、8.4.7、8.6.1、8.6.5、8.9、10.3.2、12.2.1条GB/T 51262-2017 · Code for Construction Cost Appraisal 第5.9、5.9.1、5.9.2条GB/T 50875-2013 · Standard glossary of project costs 第3.4.8条2026-10-25 - 15
Handling the mismatch between construction-drawing quantities and tender BOQ quantities: measurement of actually completed quantities under GB 50500-2013 Chapter 8 and the 15% deviation price adjustment of Section 9.6 (including the divergence between the two lump-sum contract regimes of Clauses 8.3.1/8.3.2), against GB/T 50500-2024 Sections 7.2/8.2/8.9 routing the rules by contract type
GB 50500-2013 Clause 8.2.1 (a mandatory provision) requires that 'quanti…
GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第4.1.2、4.1.3、6.1.4、6.2.2、8.1.1、8.2.1、8.2.2、8.3.1、8.3.2、9.5.1、9.6.1、9.6.2、11.2.1、11.2.2、11.2.6条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.1.8、3.2.2、3.3.2、3.3.3、4.1.4、6.1.6、6.1.7、7.1.1、7.1.8、7.2.1、7.2.2、8.2.1、8.2.3、8.9.1、8.9.2条住房城乡建设部公告 2024 年第 212 号(GB/T 50500-2024 发布,2025-09-01 实施,GB 50500-2013 同时废止)2026-10-25 - 16
Boundary determination and clause routing among quantity deviation, variation and omitted BOQ items: sections 9.4/9.5/9.6 of the 2013 edition are merged into 'BOQ errors' in GB/T 50500-2024, sorted by three comparison tests (contract drawings vs contract BOQ; contract drawings vs actual construction drawings; inside vs outside the contract works scope), with an anti-double-counting rule that one matter goes through one route only
The routing test is unique: a difference between the contract drawings (…
GB/T 50500-2024 第2.0.27条(工程量清单缺陷)GB/T 50500-2024 第2.0.28条(工程变更)GB/T 50500-2024 第2.0.30条(新增工程)2026-10-25 - 17
The depth standard for describing item descriptions in the bill of quantities: describe item by item per the appendices, satisfy the needs of fixing the all-in unit rate, and never substitute the quota work content (trades)
The item description is the pricing parameter that fixes the all-in unit…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.5条、第2.0.27条GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、第4.2.4条、App. ETable E.1.1、第E.7.1条GB 50860-2013 构筑物工程工程量计算规范 第4.2.4条(强制性条文)及条文说明2026-10-20 - 18
Defining and selecting construction contract price forms: unit-rate, lump-sum and cost-plus contracts chosen by design depth, technical difficulty, time and pricing risk
GB/T 50500-2024 clause 3.4.1 fixes the selection: clear requirements, co…
GB/T 50500-2024 第2.0.6、2.0.7、2.0.8条GB/T 50500-2024 第3.1.8条GB/T 50500-2024 第3.3.1、3.3.2、3.3.3、3.3.5条2026-10-18 - 19
Quantity basis for cost estimation when BOQ quantities are overstated: costs follow actual quantities (taken off from the drawings) rather than BOQ quantities, and the effect of overstated BOQ quantities on the contract price (re-measurement and adjustment under re-measurable contracts / no adjustment under lump-sum contracts)
Cost estimation must be based on actual quantities (the drawing-based qu…
GB/T 50500-2024 第4.1.5、4.1.6、7.2.1、7.2.2、7.4.1、8.2.1、8.2.3条《国营企业成本管理条例》(国发〔1984〕34号)第十七条DB14/T 1319—2021 App. A.1.32026-10-02 - 20
May quantities cut by design variation be listed as negative BOQ items: the contract BOQ itself never goes negative - increases and decreases fall to the "variation increase-and-decrease price" item at final account; under lump-sum (fixed-price) contracts BOQ defects do not adjust, only differences between as-built and contract drawings form priceable variations (GB/T 50500-2024)
Quantity cuts from design variations must never be written as negative q…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第7.2.1条GB/T 50500-2024 第7.2.2条GB/T 50500-2024 第7.4.1条2026-09-30 - 21
Reviewing tender bills of quantities: methods and criteria for detecting omissions, errors, and duplications
Check the BOQ against four baselines—tender documents, construction draw…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 22
Risk allocation for incomplete item descriptions in the BOQ (BOQ errors and omissions): employer responsible under re-measurable (unit-rate) contracts, contractor responsible under lump-sum contracts, contractor always responsible for the bill of preliminaries
Per GB/T 50500—2024, an incomplete item description is an "error or omis…
GB/T 50500—2024 第 3.1.8、6.1.6、8.2.1、8.9.1、8.9.2、3.3.3 条GB 50500—2013 第 4.1.2、9.5.1 条《建设工程造价鉴定作业指引》T/ZBD 100.4—2023 第 4.4.4 条2026-09-25 - 23
Liability for errors or omissions in the tender BOQ: GB 50500-2013 vs GB/T 50500-2024 (2013 Clause 4.1.2 mandatory provision vs 2024 Clause 3.1.8 split by unit-rate/lump-sum contract)
GB 50500-2013, Clause 4.1.2 (mandatory provision): 'the tender BOQ must…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第3.1.8、4.1.4、6.1.6、8.2.1、8.2.3条GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第4.1.2条(已废止)住房城乡建设部公告2024年第212号(2024-11-26,www.mohurd.gov.cn)2026-09-25 - 24
Overview of bills of quantities: composition, compilation, item descriptions and handling of errors/omissions (GB/T 50500-2024)
A bill of quantities comprises four sections — trade items, preliminarie…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25 - 25
Handling tender document vs construction drawing inconsistencies in bidding: statutory objection/clarification deadlines and contractual pricing risk allocation
Objections to tender documents must be raised in writing at least 10 day…
中华人民共和国招标投标法(2017修正)第23条中华人民共和国招标投标法实施条例(2018修订)第21、22条GB/T 50500-2024 建设工程工程量清单计价标准 第3.4.5、3.4.6条2026-09-25 - 26
Checking drawing-BOQ contradictions (bill of quantities defects) before bid pricing, and responsibility boundaries (GB/T 50500-2024)
Drawing-BOQ contradictions are "BOQ defects" (extra items/omissions/mism…
GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 27
Adjustment of the contract price (GB/T 50500-2024 Chapter 8): eleven triggering events, mechanism by section, and FIDIC mapping
Adjustment of the contract price is the mechanism for changing the contr…
GB/T 50500-2024 建设工程工程量清单计价标准(第8.1.1/8.1.2条、第8.2~8.11节、第7.5节、App. A、App. G)FIDIC Red/Yellow Book 2017(第13.3、13.4、13.6、13.7、20.2.1 条〔对照〕)GB/T 50875-2013 工程造价术语标准2026-09-25 - 28
Quantity-price risk boundaries compared across lump-sum, unit-rate (re-measurable) and cost-plus contracts
The three contract types form a gradient of quantity and price risk tran…
建设部令第107号《建筑工程施工发包与承包计价管理办法》GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 建设工程造价术语标准2026-09-25 - 29
Determining quantities where drawing dimensions are incomplete: three-tier fallback plus provisional quantities at the tender/preparation stage; re-measurement plus five-tier progressive determination at the settlement stage
Where drawings are incomplete, quantities are determined along two track…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50861-2013 城市轨道交通工程工程量计算规范T/ZBD 100.4-2023 建设工程造价鉴定作业指引2026-09-25 - 30
Risk allocation and adjustment rules for preliminaries (measure) costs: GB 50500-2013 vs GB/T 50500-2024 (omitted items, scheme changes, lump sum plus exceptions)
The 2024 edition restructures preliminaries as "lump sum plus exceptions…
GB 50500-2013 建设工程工程量清单计价规范(第4.1.2、9.3.1~9.3.2、9.5.3条,已废止)GB/T 50500-2024 建设工程工程量清单计价标准(第3.1.8、3.3.3、3.3.7、6.1.5、7.3.1、8.2.2~8.2.3、8.9.4~8.9.7条)2026-09-25 - 31
Four-layer AI review method for checking the consistency of the bill of quantities (BOQ) against the drawings (screening for BOQ errors and omissions)
Any inconsistency between the BOQ and the drawings constitutes "errors a…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 32
No price adjustment for BOQ defects in lump-sum contracts (BOQ quantities below drawings): the four-layer rule of GB/T 50500-2024 and the reversal of the 2013 edition's Clause 8.3.1 measure-and-value rule
Under GB/T 50500-2024 (effective 2025-09-01; GB 50500-2013 simultaneousl…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.7条/3.4.6条/4.1.6条/7.2.2条/7.4.1条/7.4.3条GB 50500-2013 建设工程工程量清单计价规范 第8.3.1条/8.3.2条(已废止)住建部发布公告:https://www.mohurd.gov.cn/gongkai/zc/wjk/art/2024/art_6186304e164c4c4982904f8734983235.html2026-09-25 - 33
Pricing path for variation items with no applicable or analogous all-in unit rate: agreeing a market-reasonable all-in rate, the cost-plus-profit fallback, and the expert-assessment position (GB/T 50500-2024 clauses 8.9 and 8.6.3; GB/T 50319-2013 clause 6.3.3; T/ZBD 100.4-2023 clause 4.6.2)
When a variation item has neither an identical nor an analogous all-in u…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.9.1条、第8.9.2条、第8.9.3条、第8.6.3条GB/T 50319-2013 · Code for Construction Project Supervision 第6.3.3条T/ZBD 100.4-2023 · Work Guideline for Construction Cost Appraisal 第4.6.2条2026-09-25 - 34
GB/T 50854-2024 foundation earthwork BOQ quantity rules: pit/trench excavation includes working space, excludes sloping; trench-vs-pit division and excavation depth
Per GB/T 50854-2024 Appendix A Table A.2.1, the BOQ quantity of pit/tren…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准(App. A 土石方工程:Table A.2.1、A.4.5、A.4.6、A.4.7)GB/T 50500-2024 建设工程工程量清单计价标准(第7.2.1、8.2.1、8.9.1、8.9.2条)GB 50854-2013 房屋建筑与装饰工程工程量计算规范(对比参照)2026-09-25 - 35
A seven-step process for systematically checking BOQ errors and omissions (BOQ defects) and defect-liability handling
With tender drawings, the calculation-standard appendices, and the tende…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25